For <strong>the</strong> Pine Point operati<strong>on</strong>s <strong>the</strong>re is <strong>the</strong> flexibility to hire certain equipment as needed from<br />

c<strong>on</strong>tractors in Hay River or Fort Resoluti<strong>on</strong>.<br />

First Fills and C<strong>on</strong>tainers<br />

C<strong>on</strong>tainers for <strong>the</strong> c<strong>on</strong>centrate movement between <strong>the</strong> TLP and Pine Point have been specified<br />

as 45 t capacity c<strong>on</strong>tainers. Initially two sets of c<strong>on</strong>tainers will be required (<strong>on</strong>e at Pine Point<br />

and <strong>on</strong>e at <strong>the</strong> TLP) and <strong>the</strong>n a third and fourth set are required when <strong>the</strong> operating rate is<br />

doubled. An estimate of first fills cost is provided in Table 18-35.<br />

Table 18-35 First Fills and C<strong>on</strong>tainers Capital Cost Estimate<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

C$ '000<br />

First Fills (Mill) 20,457<br />

First Fills (Fuel) 18,700<br />

Warehouse Spares 5,324<br />

Sec<strong>on</strong>d Set C<strong>on</strong>tainers 33,399<br />

Hydrometallurgical Spares and 1st Fills 3,500<br />

Recovery of Stores (32,967)<br />

Total 48,414<br />

For <strong>the</strong> start of operati<strong>on</strong>s at Thor Lake a supply of reagent and fuel will be required. Then<br />

when <strong>the</strong> operati<strong>on</strong> is expanded <strong>the</strong> quantity will need to be increased. Scott Wils<strong>on</strong> RPA has<br />

included a full year of reagents and fuel to ensure that <strong>the</strong>re is not a reducti<strong>on</strong> in producti<strong>on</strong> due<br />

to a lack of fuel or reagents.<br />

Indirect Costs<br />

The indirect costs are estimated to be C$80.7 milli<strong>on</strong> as summarized in Table 18-36.<br />

Engineering for <strong>the</strong> facilities and operati<strong>on</strong>s will be carried out through <strong>the</strong> permitting and <strong>the</strong><br />

c<strong>on</strong>structi<strong>on</strong> phases. Regulators are expected to require a significant level of detail especially<br />

for any facilities related to water. Engineering costs for <strong>the</strong> completi<strong>on</strong> of <strong>the</strong> detailed<br />

engineering is included in this estimate.<br />

Technical Report 43-101 – March 13, 2011 Page 18-113<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.