Table 18-33 Surface Infrastructure Capital Cost Estimate<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

C$ '000<br />

Surface Equipment 9,597<br />

Infrastructure 26,472<br />

Total 36,069<br />

Hydrometallurgical Plant<br />

The hydrometallurgical plant capital estimate has been prepared by Melis. The plant cost was<br />

based <strong>on</strong> <strong>the</strong> use of new equipment and <strong>the</strong> initial plant capacity is generally suitable for <strong>the</strong><br />

expanded producti<strong>on</strong> case as <strong>the</strong> equipment and processes are not amenable to <strong>the</strong> use of<br />

parallel streams for <strong>the</strong> expanded case.<br />

An acid plant will be built at <strong>the</strong> site and <strong>the</strong> cost estimate for <strong>the</strong> acid plant is based <strong>on</strong> a<br />

quotati<strong>on</strong> by a suphuric acid plant supplier. A capital estimate summary for <strong>the</strong> Pine Point site is<br />

shown in Table 18-34.<br />

The Pine Point tailings facility design was completed by Knight Piésold who provided <strong>the</strong><br />

material quantities for <strong>the</strong> tailings area. Scott Wils<strong>on</strong> RPA provided <strong>the</strong> unit cost estimates to<br />

generate a cost estimate for <strong>the</strong> facility. The Pine Point tailings facility is planned to be<br />

c<strong>on</strong>structed in two phases to reduce <strong>the</strong> initial capital outlay. Phase 1 of <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> is<br />

required for <strong>the</strong> commencement of operati<strong>on</strong>s<br />

Table 18-34 Hydrometallurgical Plant Capital Cost Estimate<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

C$ '000<br />

Hydrometallurgical Plant 194,392<br />

Surface Equipment (Pine Point) 5,173<br />

Tailings (Pine Point) 22,829<br />

Acid plant 90,708<br />

Total 313,102<br />

A mobile fleet will be required at Pine Point to support <strong>the</strong> hydrometallurgical plant operati<strong>on</strong>s<br />

and for <strong>the</strong> transportati<strong>on</strong> of goods to and from <strong>the</strong> dock throughout <strong>the</strong> year, In this area as<br />

well Scott Wils<strong>on</strong> RPA recommends that good used equipment be sought for <strong>the</strong> service units<br />

which are required but are not full time producti<strong>on</strong> units.<br />

Technical Report 43-101 – March 13, 2011 Page 18-112<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.