excavati<strong>on</strong>s are included in <strong>the</strong> mine development costs but <strong>the</strong> purchase and installati<strong>on</strong> of <strong>the</strong><br />

crusher and ore c<strong>on</strong>veyor are included in <strong>the</strong> mill capital cost estimate.<br />

C<strong>on</strong>centrator<br />

C<strong>on</strong>centrator capital costs were taken from <strong>the</strong> estimate by Melis based up<strong>on</strong> <strong>the</strong> costs factored<br />

against installed equipment cost. For presentati<strong>on</strong> <strong>the</strong> fuel use during c<strong>on</strong>structi<strong>on</strong> was<br />

deducted and moved into <strong>the</strong> “indirect” category and <strong>the</strong> c<strong>on</strong>tingency was deducted and added<br />

into <strong>the</strong> overall c<strong>on</strong>tingency for <strong>the</strong> <strong>project</strong>. Capital spares were also deducted and moved to a<br />

different category. A 1.8% adjustment was added to <strong>the</strong> loaded labour costs reflecting <strong>the</strong> NWT<br />

2% payroll tax burden applicable to payroll and b<strong>on</strong>uses. A summary of <strong>the</strong> capital cost<br />

estimate is shown in Table 18-32.<br />

Table 18-32 C<strong>on</strong>centrator Capital Cost Estimate<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

C$ '000<br />

Mill (TLP) 128,251<br />

Tailings Facility (TLP) 9,093<br />

Total 137,344<br />

The Thor Lake tailings facility design was completed by Knight Piésold who provided <strong>the</strong><br />

material quantities for <strong>the</strong> tailings area. Scott Wils<strong>on</strong> RPA has provided <strong>the</strong> unit cost estimates<br />

for <strong>the</strong> work to generate <strong>the</strong> cost estimate. The tailings facility will be c<strong>on</strong>structed in two<br />

separate phases with <strong>the</strong> sec<strong>on</strong>d phase of c<strong>on</strong>structi<strong>on</strong> required when <strong>the</strong> operati<strong>on</strong> is<br />

expanded.<br />

Surface Infrastructure and Equipment<br />

A surface equipment fleet has been developed for <strong>the</strong> TLP and is shown in Table 18-33. The<br />

surface equipment has been estimated as a mixture of new and used equipment. Equipment<br />

such as <strong>the</strong> grader and cranes, which will not see extensive heavy service, will be purchased<br />

used and are expected to be able to meet <strong>the</strong> operati<strong>on</strong>’s requirements. Wherever possible <strong>the</strong><br />

use of good used equipment for this support fleet would be evaluated and used in place of new<br />

units. In <strong>the</strong> case of <strong>the</strong> c<strong>on</strong>tainer forklifts, new units are proposed as <strong>the</strong>se units are critical to<br />

<strong>the</strong> fast turnaround of <strong>the</strong> barges and regular movement of c<strong>on</strong>centrate c<strong>on</strong>tainers.<br />

This infrastructure includes all of <strong>the</strong> roads, yards, airstrip, camp, power and supplies storage<br />

needs for TLP including <strong>the</strong> materials handling requirements at Great Slave Lake. The camp<br />

has been estimated <strong>on</strong> <strong>the</strong> basis of a new camp and <strong>the</strong> power supply system is a new modular<br />

system designed by Finning and based <strong>on</strong> <strong>the</strong> Caterpillar 3516HD diesel generators.<br />

Technical Report 43-101 – March 13, 2011 Page 18-111<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.