Table 18-31 Mine Capital Cost Estimate<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

C$ '000<br />

UG Equipment 17,385<br />

UG Development 24,314<br />

UG Services 18,745<br />

Recovery of Stores (cement) (6,000)<br />

Total 54,445<br />

The mine equipment will be purchased through <strong>the</strong> preproducti<strong>on</strong> period with <strong>the</strong> equipment to<br />

be used for <strong>the</strong> mine development with c<strong>on</strong>tract operators and subsequently to be used by<br />

company pers<strong>on</strong>nel for operati<strong>on</strong>s.<br />

The l<strong>on</strong>g hole drill while included in <strong>the</strong> total is not purchased until after <strong>the</strong> start of operati<strong>on</strong>s<br />

as <strong>the</strong> early producti<strong>on</strong> will all come from drifting in ore, slashing to width and benching or<br />

breasting as appropriate.<br />

Capital mine development will be undertaken by c<strong>on</strong>tractors using mobile equipment provided<br />

by Aval<strong>on</strong>. The mining equipment will be operated and maintained by <strong>the</strong> c<strong>on</strong>tractor while being<br />

used by <strong>the</strong> c<strong>on</strong>tractor. Aval<strong>on</strong> will provide supplies, explosives, fuel, power, and camp<br />

accommodati<strong>on</strong>s.<br />

Stope producti<strong>on</strong> is not included in <strong>the</strong> capital development period as capital development is<br />

planned to be stopped at <strong>the</strong> stope entrance.<br />

Scott Wils<strong>on</strong> RPA used <strong>the</strong> mine c<strong>on</strong>tracting labour and maintenance costs as presented by<br />

TMCC and <strong>the</strong>n deleted <strong>the</strong> equipment ownership costs as <strong>the</strong> equipment will be purchased by<br />

Aval<strong>on</strong>. Scott Wils<strong>on</strong> RPA estimated <strong>the</strong> materials and supplies for <strong>the</strong> development based <strong>on</strong><br />

cost estimates for <strong>the</strong> various items and supplies required for development. Material freight<br />

costs are included in <strong>the</strong> annual barge lift costs.<br />

Raise development costs for <strong>the</strong> ventilati<strong>on</strong> raise and <strong>the</strong> ore pass were based up<strong>on</strong> <strong>the</strong> use of<br />

an Alimak raise climber and <strong>the</strong> costs were based <strong>on</strong> an estimate from TMCC. The estimated<br />

raising cost was C$2,200 for a 3 m by 3 m raise and C$3,000 per metre for a 4 m by 4 m raise<br />

plus set up and tear down costs of C$41,000 per raise and C$64,000 for mobilizati<strong>on</strong> and<br />

demobilizati<strong>on</strong>.<br />

Underground services include <strong>the</strong> mine power and ventilati<strong>on</strong> systems as well as a paste<br />

backfill distributi<strong>on</strong> system when <strong>the</strong> mine is expanded to 2,000 tpd. The underground crusher<br />

Technical Report 43-101 – March 13, 2011 Page 18-110<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.