Wildlife<br />

Early science-based wildlife studies of <strong>the</strong> Pine Point area were first c<strong>on</strong>ducted during <strong>the</strong><br />

period 1976 to 1980 by BC Research to evaluate <strong>the</strong> envir<strong>on</strong>mental c<strong>on</strong>sequences of<br />

Cominco’s mining operati<strong>on</strong> at Pine Point (BC Research 1983). More recent wildlife studies of<br />

<strong>the</strong> Tamerlane Regi<strong>on</strong>al Study Area (RSA) were carried out by EBA in September 2005 and<br />

during <strong>the</strong> spring, summer and fall of 2006 (EBA 2006a, 2006b). Based up<strong>on</strong> wildlife surveys,<br />

interviews and published informati<strong>on</strong>, EBA estimates that <strong>the</strong> Pine Point area is inhabited by 40<br />

species of mammals, 201 species of birds and four species of amphibians. Major mammal<br />

species include <strong>the</strong> snowshoe hare, red squirrel, American beaver, comm<strong>on</strong> porcupine, coyote,<br />

gray wolf, black bear, ermine (stoat), mink, lynx, woodland caribou, moose, and <strong>the</strong> wood bis<strong>on</strong>.<br />

Ten of <strong>the</strong> most comm<strong>on</strong> bird species include <strong>the</strong> American robin, tundra swans, white-winged<br />

scoter, gray jay, comm<strong>on</strong> raven, spruce grouse, and <strong>the</strong> bohemian waxwings.<br />

Potential Effects, Management and Mitigati<strong>on</strong><br />

EBA suggests that <strong>the</strong> implementati<strong>on</strong> of <strong>the</strong> following measures will minimize <strong>the</strong> impact of<br />

Aval<strong>on</strong>’s operati<strong>on</strong>s at Pine Point <strong>on</strong> <strong>the</strong> surrounding area and help Aval<strong>on</strong> meet <strong>the</strong><br />

requirements of <strong>the</strong> MVLWB:<br />

• Utilizati<strong>on</strong> of <strong>the</strong> existing power grid at Pine Point to reduce <strong>the</strong> need for diesel power<br />

generati<strong>on</strong> at <strong>the</strong> Nechalacho Mine and Flotati<strong>on</strong> Plant site.<br />

• Full compliance with MVLWB Land Use Permit and Water Licence terms and c<strong>on</strong>diti<strong>on</strong>s.<br />

• C<strong>on</strong>formance with <strong>the</strong> Guidelines for Ambient Air Quality Standards in <strong>the</strong> NWT.<br />

• Use of low sulphur diesel fuel and regular equipment and engine maintenance.<br />

• Use of high quality, low sulphur coal to generate high heat fuel for <strong>the</strong> Hydrometallurgical<br />

Plant boilers.<br />

• Applicati<strong>on</strong> of clean coal technologies, stack testing and air quality m<strong>on</strong>itoring to ensure<br />

that federal and territorial ambient air quality objectives are met.<br />

• C<strong>on</strong>formance with GNWT Guideline for Dust suppressi<strong>on</strong> through <strong>the</strong> applicati<strong>on</strong> of dust<br />

suppressants - e.g. water or approved dust suppressant products.<br />

• Secure c<strong>on</strong>tainment of rare metals products during transportati<strong>on</strong> to <strong>the</strong> Hay River<br />

railhead.<br />

• Disposal of all hazardous wastes in an approved manner.<br />

• Development <strong>on</strong> rare ecosystem types will be avoided (n<strong>on</strong>e are anticipated to be<br />

present within <strong>the</strong> Hydrometallurgical Plant comp<strong>on</strong>ents of <strong>the</strong> overall Project footprint).<br />

• Re-c<strong>on</strong>touring, scarificati<strong>on</strong>, and reseeding of <strong>the</strong> haul road surface during future closure<br />

and reclamati<strong>on</strong> of <strong>the</strong> road will be carried out, if warranted.<br />

• The seas<strong>on</strong>al barging dock will be designed and c<strong>on</strong>structed to meet <strong>the</strong> requirements<br />

of Transport Canada and c<strong>on</strong>diti<strong>on</strong>s of <strong>the</strong> NWPA approval to be issued pursuant to <strong>the</strong><br />

Navigable Waters Protecti<strong>on</strong> Act.<br />

Technical Report 43-101 – March 13, 2011 Page 18-104<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.