elative to uranium, <strong>the</strong> overall effect of typical Nechalacho mineralizati<strong>on</strong> as a rock mass is<br />

predicted to be very low. The rare earth c<strong>on</strong>centrati<strong>on</strong> process planned at <strong>the</strong> Flotati<strong>on</strong> Plant will<br />

c<strong>on</strong>centrate <strong>the</strong> rare earths including <strong>the</strong> low levels of <strong>thor</strong>ium in <strong>the</strong> rock minerals. The overall<br />

radiati<strong>on</strong> level is expected to be below Canadian Transportati<strong>on</strong> of Dangerous Goods<br />

regulati<strong>on</strong>s and will not require special handling as dangerous goods.<br />

Reclamati<strong>on</strong><br />

Reclamati<strong>on</strong> and closure of all <strong>the</strong> Nechalacho Mine and Flotati<strong>on</strong> Plant facilities will be<br />

c<strong>on</strong>ducted in accordance with <strong>the</strong> terms and c<strong>on</strong>diti<strong>on</strong>s of <strong>the</strong> future MVLWB Land Use Permit<br />

and Water Licence, <strong>the</strong> “Mine Site Reclamati<strong>on</strong> Policy for <strong>the</strong> Northwest Territories” and <strong>the</strong><br />

“Mine Site Reclamati<strong>on</strong> Guidelines for <strong>the</strong> Northwest Territories and Nunavut” (INAC, 2007).<br />

Reclamati<strong>on</strong> and closure will be based <strong>on</strong> <strong>the</strong> following general objectives:<br />

• Reclamati<strong>on</strong> goals and objectives will be c<strong>on</strong>sidered during design and planning of<br />

c<strong>on</strong>structi<strong>on</strong> and operati<strong>on</strong>s;<br />

• Progressive reclamati<strong>on</strong> will be implemented where possible;<br />

• Up<strong>on</strong> cessati<strong>on</strong> of operati<strong>on</strong>s, <strong>the</strong> areas will be decommissi<strong>on</strong>ed and rehabilitated to<br />

allow for future land use as guided by <strong>the</strong> federal and territorial regulatory agencies; and<br />

• Reclamati<strong>on</strong> and closure will ensure that l<strong>on</strong>g-term physical and chemical stability is<br />

provided.<br />

The initial reclamati<strong>on</strong> and closure plan prepared for <strong>the</strong> Nechalacho Mine and Flotati<strong>on</strong> Plant<br />

site will be a living document that will be updated throughout <strong>the</strong> Project’s life to reflect changing<br />

c<strong>on</strong>diti<strong>on</strong>s and <strong>the</strong> input of <strong>the</strong> applicable federal and territorial regulatory agencies.<br />

The primary reclamati<strong>on</strong> activities will involve <strong>the</strong> removal of surface facilities and infrastructure,<br />

<strong>the</strong> re-c<strong>on</strong>touring and scarificati<strong>on</strong> of <strong>the</strong> footprint area, <strong>the</strong> applicati<strong>on</strong> of stockpiled organics,<br />

and re-vegetati<strong>on</strong> to <strong>the</strong> extent possible.<br />

Specifically for <strong>the</strong> tailings management facility, <strong>the</strong> main objective of <strong>the</strong> closure and<br />

reclamati<strong>on</strong> initiatives will be to transform <strong>the</strong> tailings management facility area to its pre-mining<br />

usage and capability to <strong>the</strong> greatest degree possible. Closure and reclamati<strong>on</strong> strategies will<br />

focus <strong>on</strong> stabilizing and covering <strong>the</strong> exposed tailing surfaces and re-establishing surface flow<br />

patterns, while ensuring that acceptable downstream water quality is maintained. Specific<br />

reclamati<strong>on</strong> activities pertaining to <strong>the</strong> tailings management facility area will include <strong>the</strong><br />

following:<br />

Technical Report 43-101 – March 13, 2011 Page 18-100<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.