<strong>the</strong> price for tantalum chemicals in 2014. Scott Wils<strong>on</strong> RPA (2010) regarded this price as a<br />

c<strong>on</strong>servative estimate of future prices.<br />

Scott Wils<strong>on</strong> RPA did not have any independent estimates of future pricing of tantalum<br />

products. However, MDN-Crevier, <strong>the</strong> developer of <strong>the</strong> proposed Crevier niobium-tantalum mine<br />

in Quebec, have indicated that for <strong>the</strong> purposes of <strong>the</strong>ir prefeasibility study <strong>the</strong>y are assuming<br />

US$150/kg for Ta 2 O 5 . This suggests c<strong>on</strong>siderable upside in <strong>the</strong> market, and it is recommended<br />

that:<br />

• Fur<strong>the</strong>r investigati<strong>on</strong> be completed in order to verify future price predicti<strong>on</strong>s.<br />

• Clearer definiti<strong>on</strong> be completed of <strong>the</strong> Thor Lake Ta products and<br />

• That <strong>the</strong> pricing of Ta intermediate products be investigated.<br />

It is <strong>the</strong> c<strong>on</strong>clusi<strong>on</strong> of Aval<strong>on</strong> that <strong>the</strong> recommended estimates by Scott Wils<strong>on</strong> RPA for price<br />

predicti<strong>on</strong> for tantalum should c<strong>on</strong>tinue to be utilized at present.<br />

MARKETING CONCLUSIONS<br />

Scott Wils<strong>on</strong> RPA noted that <strong>the</strong> prices used in <strong>the</strong> PFS were higher than 2010 prices. The<br />

prices were based <strong>on</strong> independent, third-party forecasts for 2014, based <strong>on</strong> supply and demand<br />

<strong>project</strong>i<strong>on</strong>s from 2009 to 2014. Unlike forecasts for more comm<strong>on</strong> metals, which tend to decline<br />

to a l<strong>on</strong>g-term value below current prices, <strong>the</strong> forecasts for <strong>the</strong> rare metals produced by <strong>the</strong><br />

Project end up higher than current prices. Since <strong>the</strong> Project schedules producti<strong>on</strong> commencing<br />

in 2014, Scott Wils<strong>on</strong> RPA was of <strong>the</strong> opini<strong>on</strong> that <strong>the</strong>se l<strong>on</strong>g-term price forecasts were a<br />

reas<strong>on</strong>able basis for estimati<strong>on</strong> of Mineral Reserves. Subsequent to <strong>the</strong> previous <str<strong>on</strong>g>technical</str<strong>on</strong>g><br />

<str<strong>on</strong>g>report</str<strong>on</strong>g> (Scott Wils<strong>on</strong>, 2010) as noted above, prices of many rare earths have increased, and as<br />

a result, current prices in many cases are higher than those predicted for 2014.<br />

CONTRACTS<br />

At this time Aval<strong>on</strong> has not entered into any l<strong>on</strong>g term agreements for <strong>the</strong> provisi<strong>on</strong> of materials,<br />

supplies or labour for <strong>the</strong> Project. Aval<strong>on</strong> has entered into an agreement with Det<strong>on</strong> Cho<br />

Corporati<strong>on</strong>, a Yellowknives Dene First Nati<strong>on</strong> participating in business for <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> of<br />

an airstrip at Thor Lake in <strong>the</strong> summer of 2010. Aval<strong>on</strong> has worked with <strong>the</strong> local First Nati<strong>on</strong><br />

groups to date and plans to negotiate a Memorandum of Understanding with <strong>the</strong> local First<br />

Nati<strong>on</strong> groups as part of <strong>the</strong> negotiati<strong>on</strong> of Impact and Benefits Agreements.<br />

The c<strong>on</strong>structi<strong>on</strong> and operati<strong>on</strong>s will require negotiati<strong>on</strong> and executi<strong>on</strong> of a number of c<strong>on</strong>tracts<br />

for <strong>the</strong> supply of materials, services and supplies.<br />

Technical Report 43-101 – March 13, 2011 Page 18-94<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.