epresenting about 18% of total zirc<strong>on</strong> demand, was c<strong>on</strong>verted to approximately 96,000 t<strong>on</strong>nes<br />

(Zr equivalent) of zirc<strong>on</strong>ium chemicals and approximately 10,000 t<strong>on</strong>nes of zirc<strong>on</strong>ium metal.<br />

Demand for zirc<strong>on</strong> in chemicals manufacture and zirc<strong>on</strong>ium metal producti<strong>on</strong> is <strong>project</strong>ed to<br />

increase to approximately 250,000 t<strong>on</strong>nes out of a total zirc<strong>on</strong> demand of approximately 1.4<br />

milli<strong>on</strong> t<strong>on</strong>nes by 2012. Changes in end use demand patterns in recent years are illustrated in<br />

Figure 18-14.<br />

Figure 18-14 Zirc<strong>on</strong> Demand Patterns, 2000 to 2012<br />

Source: TZMI<br />

Industry growth is estimated at approximately 4.5% per annum. By 2015, demand for zirc<strong>on</strong>ium<br />

chemicals is <strong>project</strong>ed to be approximately 150,000 t<strong>on</strong>nes, distributed as detailed in Figure 18-<br />

15.<br />

Technical Report 43-101 – March 13, 2011 Page 18-88<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.