Table 18-16 Hydrometallurgical Plant Electrical Load<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

1,000 tpd 2,000 tpd<br />

Installed Electrical Equipment<br />

Acid plant kW 3,000 3,000<br />

Hydromet kW 6,478 7,478<br />

Lime kiln and slaking kW 400 400<br />

Limest<strong>on</strong>e grinding kW 500 500<br />

Total Installed kW 10,378 11,378<br />

Estimated Operating Electrical Load<br />

Acid plant kW 1,791 2,115<br />

Hydromet kW 2,210 4,487<br />

Lime kiln and slaking kW 130 260<br />

Limest<strong>on</strong>e grinding kW 225 450<br />

Total Power Draw kW 4,356 7,312<br />

Energy Use MW-hrs/a 33,025 55,435<br />

The power cost estimates are based up<strong>on</strong> <strong>the</strong> supply of 6 MW of electrical power from <strong>the</strong> grid<br />

in <strong>on</strong>e quarter of a year and <strong>the</strong> provisi<strong>on</strong> of up to 9 MW of electrical power from <strong>the</strong> grid in <strong>the</strong><br />

o<strong>the</strong>r three quarters of <strong>the</strong> year. Diesel generati<strong>on</strong> of 1.3 MW will be required in <strong>on</strong>e quarter of<br />

a year at <strong>the</strong> 2,000 tpd rate. Electrical energy is available at <strong>the</strong> substati<strong>on</strong> with that power<br />

coming from <strong>the</strong> NWT Energy grid from <strong>the</strong> Talts<strong>on</strong> dam in <strong>the</strong> sou<strong>the</strong>rn NWT.<br />

SURFACE MOBILE EQUIPMENT<br />

The surface mobile equipment at <strong>the</strong> Pine Point site will be required to support <strong>the</strong> operati<strong>on</strong>. In<br />

light of <strong>the</strong> potential to hire local equipment from Fort Resoluti<strong>on</strong>, Hay River or o<strong>the</strong>r local area<br />

communities it will not be necessary to be completely self sufficient as at <strong>the</strong> TLP.<br />

A list of <strong>the</strong> surface mobile equipment for <strong>the</strong> Pine Point site is show in Table 18-17.<br />

AIRSTRIP AT PINE POINT<br />

When Pine Point Mines was in operati<strong>on</strong> <strong>the</strong>re was an airstrip that was in service near <strong>the</strong> town.<br />

This strip is no l<strong>on</strong>ger available for use and it is not planned for rehabilitati<strong>on</strong> in this study.<br />

Technical Report 43-101 – March 13, 2011 Page 18-68<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.