CONCENTRATE HANDLING<br />

C<strong>on</strong>centrate will arrive from <strong>the</strong> TLP in c<strong>on</strong>tainers from <strong>the</strong> annual sealift over <strong>the</strong> summer<br />

seas<strong>on</strong>. The first c<strong>on</strong>tainers would be expected to arrive commencing in late July with <strong>on</strong>going<br />

arrival over a <strong>on</strong>e m<strong>on</strong>th period.<br />

The c<strong>on</strong>tainers will be unloaded to a storage facility immediately adjacent to <strong>the</strong> dock at Pine<br />

Point before being shipped by truck to <strong>the</strong> process facility at Pine Point. If space permits <strong>the</strong><br />

c<strong>on</strong>centrate could be stored in that locati<strong>on</strong> for an extended (m<strong>on</strong>ths) period and slowly moved<br />

to <strong>the</strong> Pine Point treatment facility.<br />

C<strong>on</strong>centrate which was loaded and stored at TLP over <strong>the</strong> winter m<strong>on</strong>ths will be frozen and will<br />

not be amenable to rapid unloading. C<strong>on</strong>tainers will be tracked by number to determine those<br />

that are in all likelihood frozen so that <strong>the</strong>y can be exposed to summer heating whereas those<br />

that are thawed can be emptied to a covered c<strong>on</strong>centrate storage area.<br />

Facilities for <strong>the</strong> thawing of c<strong>on</strong>centrate c<strong>on</strong>tainers will be installed at Pine Point to use waste<br />

heat to allow <strong>the</strong> thawing of c<strong>on</strong>centrate so that it can be unloaded from <strong>the</strong> c<strong>on</strong>tainers over <strong>the</strong><br />

year. . While it would be advantageous to unload and return <strong>the</strong> c<strong>on</strong>tainer to <strong>the</strong> TLP as quickly<br />

as possible to reduce <strong>the</strong> number of c<strong>on</strong>tainers in <strong>the</strong> circuit it is unlikely that this will be<br />

possible and <strong>the</strong> current plan is to have enough c<strong>on</strong>tainers to have a full set of empty c<strong>on</strong>tainers<br />

and a full set of full c<strong>on</strong>tainers.<br />

The shipment of c<strong>on</strong>centrate in closed c<strong>on</strong>tainers eliminates <strong>the</strong> risks of dusting and is expected<br />

to reduce <strong>the</strong> potential for loss of c<strong>on</strong>centrate during transportati<strong>on</strong>.<br />

POWER<br />

The planned installed electrical load at <strong>the</strong> Pine Point facility is 10.4 MW for <strong>the</strong> 1,000 tpd case<br />

and 11.4 MW at <strong>the</strong> 2,000 tpd rate broken down as shown in Table 18-16.<br />

Technical Report 43-101 – March 13, 2011 Page 18-67<br />