MEDICAL FACILITY<br />

The medical facility at <strong>the</strong> site will c<strong>on</strong>sist of an appropriately supplied first aid stati<strong>on</strong> and <strong>the</strong>re<br />

will be appropriately qualified first aid pers<strong>on</strong>nel <strong>on</strong> site and <strong>on</strong> call at all times. The first aid<br />

room will be located in <strong>the</strong> mine office complex area.<br />

An ambulance will be available <strong>on</strong> site for <strong>the</strong> transport of injured pers<strong>on</strong>nel to <strong>the</strong> first aid<br />

stati<strong>on</strong>s and <strong>the</strong>n <strong>on</strong> to <strong>the</strong> air strip. Seriously injured pers<strong>on</strong>nel will be evacuated from <strong>the</strong> site<br />

by air to Yellowknife. The ambulance will be a diesel powered unit and will be certified for<br />

operati<strong>on</strong> within <strong>the</strong> underground mine.<br />

A fire truck will be available <strong>on</strong> site to resp<strong>on</strong>d to surface fire incidents. The surface fire brigade<br />

will be a combinati<strong>on</strong> of pers<strong>on</strong>nel from <strong>the</strong> site.<br />

Mine rescue gear will be purchased and located within a mine rescue training area in <strong>the</strong> office<br />

complex. Mine rescue pers<strong>on</strong>nel will be selected and trained as required under <strong>the</strong> Mine Safety<br />

Rules.<br />

PINE POINT INFRASTRUCTURE<br />

PROCESS FACILITY SITE<br />

In additi<strong>on</strong> to <strong>the</strong> process facility <strong>the</strong>re will be a requirement for:<br />

• Administrati<strong>on</strong> Offices<br />

• Dry and lunch room<br />

• Warehouse<br />

• Shops<br />

• Assay/Metallurgical Lab<br />

• Reagent storage, mixing tanks<br />

• C<strong>on</strong>tainer storage area<br />

ACCESS ROADS<br />

The hydrometallurgical plan is to be located in an old borrow pit located <strong>on</strong> <strong>the</strong> east side of <strong>the</strong><br />

tailings facility. There is a network of roads that c<strong>on</strong>nect <strong>the</strong> plant site to <strong>the</strong> main access roads<br />

but it will be necessary to upgrade short secti<strong>on</strong>s of <strong>the</strong> road for plant access.<br />

There is an existing 7.5 km l<strong>on</strong>g light use road that c<strong>on</strong>nects <strong>the</strong> Pine Point road network to <strong>the</strong><br />

site of <strong>the</strong> proposed dock which is <strong>the</strong> former fresh water reclaim area. For <strong>the</strong> plant operati<strong>on</strong>s<br />

Technical Report 43-101 – March 13, 2011 Page 18-65<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.