Dock Yard<br />

The yard at <strong>the</strong> dock will require <strong>the</strong> development of a yard for <strong>the</strong> handling of materials as <strong>the</strong>y<br />

are offloaded and loaded and for <strong>the</strong> transfer of c<strong>on</strong>tainers between <strong>the</strong> Thor Lake site and <strong>the</strong><br />

dock at GSL. At a minimum <strong>the</strong>re will be:<br />

• a 40 to 50 m l<strong>on</strong>g ramp to access <strong>the</strong> barge deck for loading and unloading barges<br />

• a 45 m by 60 m (3 M l capacity) lined bermed fuel storage area<br />

• a minimum 1,200 m 2 area for full c<strong>on</strong>tainers (276 c<strong>on</strong>tainers stacked four high)<br />

• minimum 1,200 m 2 area for empty and returning c<strong>on</strong>tainers<br />

• parking area for intermodal freight and trucks<br />

• Diesel pumps and piping for <strong>the</strong> transfer of fuel from <strong>the</strong> barges to <strong>the</strong> fuel storage tanks<br />

• A receiving/security/ lunchroom facility<br />

• Diesel generati<strong>on</strong> to power fuel pumps and site services<br />

• A small floating dock for <strong>the</strong> work boat<br />

Material Handling<br />

C<strong>on</strong>tainer forklifts will be used to offload empty c<strong>on</strong>tainers and load full c<strong>on</strong>tainers. All annual<br />

supplies except diesel fuel and propane will arrive in similar ISO c<strong>on</strong>tainers as those used for<br />

c<strong>on</strong>centrate or in full size c<strong>on</strong>tainers.<br />

This design c<strong>on</strong>cept is based <strong>on</strong> <strong>the</strong> following barging cycle schedule:<br />

• The arriving in three barges will be off-loaded and full (c<strong>on</strong>centrate) c<strong>on</strong>tainers will be<br />

loaded during two to three 24 hour days after <strong>the</strong> tug with <strong>the</strong> last three barges in<br />

underway and off-loading at Hay River.<br />

• On arrival of <strong>the</strong> 'three-barge-train' with empty c<strong>on</strong>tainers (including some supplies), <strong>the</strong><br />

barges will be towed in to a temporary mooring near <strong>the</strong> fully loaded <strong>on</strong>es ready at <strong>the</strong><br />

dock. Off-loading from at least <strong>on</strong>e of <strong>the</strong> barges can <strong>the</strong>n start immediately.<br />

• The tug will <strong>the</strong>n take <strong>the</strong> three full barges at <strong>the</strong> dock under tow and get underway to<br />

Hay River with <strong>the</strong> new full load.<br />

• As so<strong>on</strong> as <strong>the</strong> tug has left with <strong>the</strong> load, <strong>the</strong> empty barges at <strong>the</strong> temporary mooring<br />

would be moved 'manually' with <strong>the</strong> aid of a dedicated small work boat and/or a land<br />

based tow-motor al<strong>on</strong>g <strong>the</strong> seawall to <strong>the</strong> dock moorings for loading.<br />

• This cycle will repeat up<strong>on</strong> arrival of <strong>the</strong> next fully loaded three-barge string.<br />

Technical Report 43-101 – March 13, 2011 Page 18-63<br />