Fuel deliveries are assumed to be spaced evenly through <strong>the</strong> shipping seas<strong>on</strong>.<br />

From <strong>the</strong> tank farm at <strong>the</strong> GSL dock <strong>the</strong> fuel will be transported by tandem axle fuel tanker to<br />

<strong>the</strong> main tank farm at <strong>the</strong> TLP facility.<br />

Main Fuel Storage<br />

A bermed fuel farm c<strong>on</strong>taining seven 1.5 milli<strong>on</strong> litre capacity diesel fuel tanks will be provided<br />

al<strong>on</strong>g <strong>the</strong> main haul access road <strong>on</strong> <strong>the</strong> south side of <strong>the</strong> plant area. This will include a fuel load<br />

out from tankers and dispensing stati<strong>on</strong> for vehicles. All mobile equipment <strong>on</strong> <strong>the</strong> plant site<br />

including pers<strong>on</strong>nel vehicles will use diesel fuel. Fuel dispensing will be m<strong>on</strong>itored to provide<br />

suitable documentati<strong>on</strong> related to <strong>the</strong> taxati<strong>on</strong> of fuel in <strong>the</strong> different uses.<br />

The tank farm area will be lined with an impermeable liner and <strong>the</strong> berm will be large enough for<br />

five additi<strong>on</strong>al tanks to be added for future expansi<strong>on</strong> to <strong>the</strong> 2,000 tpd operati<strong>on</strong>.<br />

The first phase of <strong>the</strong> tank farm c<strong>on</strong>structi<strong>on</strong> with seven tanks will require a berm which is<br />

approximately 1m high and has outside dimensi<strong>on</strong>s of approximately 45 m by 85 m.<br />

PARKING<br />

A parking area for <strong>the</strong> units required for seas<strong>on</strong>al use will be made beside <strong>the</strong> cold storage<br />

area.<br />

ACCOMMODATION, BUNKHOUSE AND CATERING<br />

The accommodati<strong>on</strong> will be pre-manufactured units which will be brought to <strong>the</strong> site and<br />

assembled into modules with sleeping quarters and wash trailers. A modular kitchen will also<br />

be brought in and set up to service <strong>the</strong> crews. Sea c<strong>on</strong>tainer refrigerati<strong>on</strong> units will be used for<br />

cold storage and for coolers while regular c<strong>on</strong>tainers will be used for canned and dry goods<br />

storage.<br />

Garbage will be collected daily and incinerated. Recyclable materials will be collected<br />

separately and shipped out annually for processing. A waste management site will be<br />

established for <strong>the</strong> l<strong>on</strong>g term storage of waste materials.<br />

Technical Report 43-101 – March 13, 2011 Page 18-56<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.