divert surface drainage away from roads and storage yards and appropriate spill resp<strong>on</strong>se plans<br />

will be developed for <strong>the</strong> various products that are to be handled in <strong>the</strong> area.<br />

TEMPORARY ORE AND WASTE ROCK STORAGE<br />

Mine development will generate approximately 150,000 t<strong>on</strong>nes of ore, low grade and waste over<br />

<strong>the</strong> course of <strong>the</strong> mine development. All of this material will be hauled to surface and ei<strong>the</strong>r<br />

used for surface c<strong>on</strong>structi<strong>on</strong> or stockpiled in permanent storage areas for waste and in<br />

temporary locati<strong>on</strong>s for low grade and ore. The ore will be used as plant feed,<br />

All of <strong>the</strong> development rock will be from drift roads and is expected to be less than 250 mm in<br />

size. The ore will be passed over a grizzly and <strong>the</strong>n crushed in <strong>the</strong> surface aggregate crusher<br />

before being fed into <strong>the</strong> mill by a fr<strong>on</strong>t end loader. A small bin and short feed belt to <strong>the</strong><br />

grinding mill feed may be needed to add <strong>the</strong> ore from <strong>the</strong> surface stockpile.<br />

PASTE BACKFILL PLANT<br />

Paste backfill is planned for use in <strong>the</strong> mine. A paste fill preparati<strong>on</strong> and pumping area will be<br />

developed adjacent to <strong>the</strong> mill building as part of <strong>the</strong> mine expansi<strong>on</strong> <strong>project</strong>.<br />

POWER GENERATION AND DISTRIBUTION<br />

An initial estimate of <strong>the</strong> electrical power requirement for <strong>the</strong> Thor Lake site is shown in Table<br />

18-13. The table does not include an allowance for separate emergency generators which will<br />

be required for <strong>the</strong> camp and may be required for some areas of <strong>the</strong> flotati<strong>on</strong> plant.<br />

Table 18-13 Power Demand<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Area<br />

Max (MW)<br />

1,000 tpd<br />

Average<br />

(MW)<br />

1,000 tpd<br />

Average<br />

(MW)<br />

1,500 tpd<br />

Average<br />

(MW)<br />

2,000 tpd<br />

Mill 5.6 3.4 4.7 6.0<br />

Mine 1.0 0.7 1.0 1.2<br />

Camp 0.5 0.4 0.6 0.8<br />

Surface 0.3 0.2 0.3 0.4<br />

Total 7.4 4.7 6.6 8.4<br />

Technical Report 43-101 – March 13, 2011 Page 18-52<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.