n<strong>on</strong>-woven geotextile) to prevent damage from ice. The Water Basin to <strong>the</strong> north of <strong>the</strong> Tailings<br />

Basin will be lined with a geomembrane liner using <strong>the</strong> same c<strong>on</strong>structi<strong>on</strong> techniques. The<br />

maximum height of <strong>the</strong> Tailings Basin and Polishing P<strong>on</strong>d embankments will be 10 m and 6 m,<br />

respectively. The final crest width will be 8.0 m (including 2 m allowance for pipelines) and slide<br />

slopes will be 3.0H:1V.<br />

Foundati<strong>on</strong> C<strong>on</strong>diti<strong>on</strong>s<br />

No site investigati<strong>on</strong>s have been completed at this stage of <strong>the</strong> <strong>project</strong>.<br />

Operati<strong>on</strong>s and M<strong>on</strong>itoring<br />

Proper operati<strong>on</strong>s, m<strong>on</strong>itoring and record keeping are a critical part of any waste or water<br />

management facility. For <strong>the</strong> HTMF, <strong>the</strong> requirements for proper operati<strong>on</strong> and m<strong>on</strong>itoring of<br />

<strong>the</strong> facility will be active and <strong>on</strong>going. Operati<strong>on</strong>s of <strong>the</strong> HTMF will require full-time pers<strong>on</strong>nel,<br />

dedicated to managing <strong>the</strong> facility.<br />

Before and during c<strong>on</strong>structi<strong>on</strong>, an Operati<strong>on</strong>, Maintenance and Surveillance (OMS) Manual will<br />

be developed for <strong>the</strong> HTMF.<br />

Tailings will be <strong>deposit</strong>ed from end of pipe discharge locati<strong>on</strong>s around <strong>the</strong> Tailings Basin.<br />

Tailings <strong>deposit</strong>i<strong>on</strong> will be rotated between <strong>the</strong> discharge locati<strong>on</strong>s to develop a flat, well<br />

draining tailings surface and maintain <strong>the</strong> supernatant p<strong>on</strong>d in <strong>the</strong> nor<strong>the</strong>rn porti<strong>on</strong> of <strong>the</strong><br />

Tailings Basin. It is recommended that a single pers<strong>on</strong> designated as Manager of <strong>the</strong> HTMF be<br />

resp<strong>on</strong>sible for <strong>the</strong> <strong>on</strong>going operati<strong>on</strong> of <strong>the</strong> facility.<br />

M<strong>on</strong>itoring of <strong>the</strong> HTMF will provide important input for performance evaluati<strong>on</strong> and refinement<br />

of operating practices. The achieved density of <strong>the</strong> tailings will be dependent <strong>on</strong> <strong>the</strong> tailings<br />

<strong>deposit</strong>i<strong>on</strong> practices and supernatant p<strong>on</strong>d volume and it will be important to collect field<br />

informati<strong>on</strong> <strong>on</strong> <strong>the</strong> in situ tailings densities during <strong>the</strong> initial m<strong>on</strong>ths of operati<strong>on</strong>s for comparis<strong>on</strong><br />

with <strong>the</strong> design values. This informati<strong>on</strong> will allow fur<strong>the</strong>r refinement of <strong>the</strong> tailings <strong>deposit</strong>i<strong>on</strong><br />

strategy and water balance model adjustments to <strong>the</strong> p<strong>on</strong>d operating levels and, if necessary,<br />

refinement to <strong>on</strong>going design.<br />

In additi<strong>on</strong> to <strong>the</strong> data collecti<strong>on</strong>, regular inspecti<strong>on</strong>s of <strong>the</strong> HTMF and associated structures will<br />

be completed. Regular inspecti<strong>on</strong>s will help identify any areas of c<strong>on</strong>cern that may require<br />

maintenance or more detailed evaluati<strong>on</strong>. The inspecti<strong>on</strong> program would include detailed visual<br />

inspecti<strong>on</strong> of all embankments and berms, pipelines, pumps, culverts, spillways, etc.<br />

Technical Report 43-101 – March 13, 2011 Page 18-50<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.