• Phase 2 (Ongoing) – The Phase 2 raise to <strong>the</strong> Tailings Basin should be scheduled for<br />

year four <strong>on</strong>wards. The Phase 2 raise may be completed in three sequential <strong>on</strong>e metre<br />

raises to <strong>the</strong> embankment.<br />

• Water Basin – Based <strong>on</strong> preliminary water balance modelling, c<strong>on</strong>structi<strong>on</strong> of <strong>the</strong> water<br />

basin is proposed to be completed during year <strong>on</strong>e of operati<strong>on</strong>s.<br />

Tailings Delivery and Distributi<strong>on</strong><br />

Tailings slurry will be pumped from <strong>the</strong> proposed Hydrometallurgical Plant Site to <strong>the</strong> Tailings<br />

Basin via insulated tailings delivery pipelines located al<strong>on</strong>g <strong>the</strong> existing access road alignment.<br />

One pipeline will be installed for initial producti<strong>on</strong> while a sec<strong>on</strong>d pipeline will be installed before<br />

year four to account for <strong>the</strong> increased throughput.<br />

Distributi<strong>on</strong> pipelines will be placed around <strong>the</strong> east, south and west sides of <strong>the</strong> Tailings Basin.<br />

Tailings <strong>deposit</strong>i<strong>on</strong> to <strong>the</strong> basin will c<strong>on</strong>sist of single end-of-pipe discharge from <strong>the</strong> tailings<br />

<strong>deposit</strong>i<strong>on</strong> pipeline to reduce icing c<strong>on</strong>cerns during <strong>the</strong> winter m<strong>on</strong>ths. During <strong>the</strong> entire<br />

operati<strong>on</strong>s 100% of <strong>the</strong> tailings solids will be pumped to <strong>the</strong> Tailings Basin at a slurry<br />

c<strong>on</strong>sistency of 20% solids by weight. Tailings discharge will be rotated between <strong>deposit</strong>i<strong>on</strong><br />

locati<strong>on</strong>s to develop a relatively flat tailings beach sloping towards <strong>the</strong> north and maintain a<br />

supernatant p<strong>on</strong>d in <strong>the</strong> nor<strong>the</strong>rn porti<strong>on</strong> of <strong>the</strong> Tailings Basin. A Polishing P<strong>on</strong>d receiving<br />

treated flows will be c<strong>on</strong>structed to <strong>the</strong> north side of <strong>the</strong> Tailings Basin if m<strong>on</strong>itoring and<br />

testwork indicate that it is required.<br />

Basin and Embankment C<strong>on</strong>structi<strong>on</strong><br />

The Tailings Basin will be a square paddock with dimensi<strong>on</strong>s of approximately 1,200 m by 1,200<br />

m. The Polishing P<strong>on</strong>d will be rectangular with dimensi<strong>on</strong>s of approximately 1,200 m by 300 m.<br />

Both basins will be situated <strong>on</strong> <strong>the</strong> existing historic tailings surface.<br />

It is assumed that historic borrow areas in close proximity to <strong>the</strong> Hydrometallurgical Site remain<br />

from previous Pine Point Mine Operati<strong>on</strong>s (EBA, 2009) could be reopened to supply granular<br />

material for <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> of <strong>the</strong> embankments if required. The existing tailings material is<br />

expected to be relatively well drained near surface.<br />

In order to keep <strong>the</strong> Hydrometallurgical tailings and process fluids separate from <strong>the</strong> historic<br />

tailings, it is proposed that <strong>the</strong> basin will be lined with a geomembrane. The geomembrane will<br />

be laid <strong>on</strong> a prepared and graded subgrade following excavati<strong>on</strong> of sand and gravel cover and<br />

historic tailings for berm c<strong>on</strong>structi<strong>on</strong>. An underdrain system c<strong>on</strong>sisting of a series of perforated<br />

CPT pipes surrounded in drainage gravel will be placed under <strong>the</strong> geomembrane to m<strong>on</strong>itor <strong>the</strong><br />

performance of <strong>the</strong> lined basin. The geomembrane will be covered <strong>on</strong> <strong>the</strong> upstream slopes of<br />

<strong>the</strong> c<strong>on</strong>tainment berm with a cover layer of historic tailings followed by riprap (separated with a<br />

Technical Report 43-101 – March 13, 2011 Page 18-49<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.