During Phase 2 of operati<strong>on</strong>s <strong>the</strong> tailings discharge pipeline will be extended around Ring and<br />

Buck Lakes. Additi<strong>on</strong>al discharge locati<strong>on</strong>s will be installed around <strong>the</strong> perimeter of <strong>the</strong> Tailings<br />

Basin and tailings <strong>deposit</strong>i<strong>on</strong> will be rotated between outlet locati<strong>on</strong>s to develop a flat tailings<br />

beach around <strong>the</strong> facility and maintain a supernatant p<strong>on</strong>d in <strong>the</strong> central porti<strong>on</strong> of <strong>the</strong> Tailings<br />

Basin. A Polishing P<strong>on</strong>d will be c<strong>on</strong>structed at <strong>the</strong> sou<strong>the</strong>ast side of <strong>the</strong> Tailings Basin if<br />

m<strong>on</strong>itoring and testwork completed during Phase 1 operati<strong>on</strong>s indicate that it is required.<br />

Operati<strong>on</strong>s and M<strong>on</strong>itoring<br />

Proper operati<strong>on</strong>s, m<strong>on</strong>itoring and record keeping are a critical part of any waste or water<br />

management facility. For <strong>the</strong> TMF, <strong>the</strong> requirements for proper operati<strong>on</strong> and m<strong>on</strong>itoring of <strong>the</strong><br />

facility will be active and <strong>on</strong>going. Operati<strong>on</strong>s of <strong>the</strong> TMF will require full-time pers<strong>on</strong>nel,<br />

dedicated to managing <strong>the</strong> facility.<br />

Before and during c<strong>on</strong>structi<strong>on</strong>, an Operati<strong>on</strong>, Maintenance and Surveillance (OMS) Manual will<br />

be developed for <strong>the</strong> TMF. The following sub-secti<strong>on</strong>s provide a preliminary overview of <strong>the</strong><br />

operati<strong>on</strong>s and m<strong>on</strong>itoring requirements.<br />

It is recommended that a single pers<strong>on</strong> designated as Manager of <strong>the</strong> TMF be resp<strong>on</strong>sible for<br />

<strong>the</strong> <strong>on</strong>going operati<strong>on</strong> of <strong>the</strong> facility. Special c<strong>on</strong>siderati<strong>on</strong> must be given to winter operati<strong>on</strong> to<br />

prevent complete freeze up of <strong>the</strong> available supernatant p<strong>on</strong>d water.<br />

M<strong>on</strong>itoring of <strong>the</strong> TMF will provide important input for performance evaluati<strong>on</strong> and refinement of<br />

operating practices. In additi<strong>on</strong> to <strong>the</strong> data collecti<strong>on</strong>, regular inspecti<strong>on</strong>s of <strong>the</strong> TMF and<br />

associated structures will be completed. Regular inspecti<strong>on</strong>s will help identify any areas of<br />

c<strong>on</strong>cern that may require maintenance or more detailed evaluati<strong>on</strong>. The inspecti<strong>on</strong> program<br />

would include detailed visual inspecti<strong>on</strong> of all embankments and berms, pipelines, pumps,<br />

culverts, spillways etc.<br />

PINE POINT TAILINGS MANAGEMENT FACILITY<br />

The proposed Hydrometallurgical Tailings Management Facility (HTMF) will be located <strong>on</strong> <strong>the</strong><br />

site of <strong>the</strong> Historic Teck Cominco Tailings P<strong>on</strong>d which is west of <strong>the</strong> Hydrometallurgical Process<br />

Plant. The c<strong>on</strong>cept includes c<strong>on</strong>structi<strong>on</strong> of a paddock type tailings basin <strong>on</strong> top of <strong>the</strong> existing<br />

tailings.<br />

Knight Piésold prepared <strong>the</strong> pre-feasibility design for facilities related to tailings and water<br />

management for <strong>the</strong> HTMF based <strong>on</strong> <strong>the</strong> following work completed:<br />

• Desktop review of available informati<strong>on</strong><br />

• Summarizati<strong>on</strong> of general site c<strong>on</strong>diti<strong>on</strong>s and design criteria<br />

Technical Report 43-101 – March 13, 2011 Page 18-45<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.