ASSAY AND METALLURGICAL LAB<br />

The mine, when operating at 1,000 tpd is expected to generate about 20 samples per shift for<br />

analysis, or 40 samples per day, with four from <strong>the</strong> each working face. In additi<strong>on</strong>, <strong>the</strong>re may be<br />

a fur<strong>the</strong>r 10 or 20 samples of various kinds such as muck samples, low grade stockpile<br />

samples, etc. These rock samples will be prepared in an area shared with <strong>the</strong> metallurgical<br />

laboratory and described below.<br />

The flotati<strong>on</strong> plant will produce composite solids samples for each shift from feed, magnetic<br />

tailings, slimes tailings, four flotati<strong>on</strong> products, and gravity tailings. Additi<strong>on</strong>ally, each product<br />

c<strong>on</strong>tainer will be sampled meaning about eight product samples per day in <strong>the</strong> initial years. In<br />

total <strong>the</strong>re will initially be 24 solid samples per day rising to 32 samples per day. In additi<strong>on</strong> to<br />

<strong>the</strong> analytical work <strong>on</strong> <strong>the</strong> solids, eight samples will be processed for screen analyses <strong>on</strong> a daily<br />

basis in <strong>the</strong> metallurgical laboratory.<br />

All soluti<strong>on</strong> samples will be sent to <strong>the</strong> ALS Laboratory in Yellowknife, or a similar organizati<strong>on</strong>,<br />

for analysis.<br />

Slurry samples will be filtered in <strong>the</strong> mill and wet filter cakes, and soluti<strong>on</strong> where appropriate,<br />

delivered to <strong>the</strong> sample preparati<strong>on</strong> area at <strong>the</strong> end of each shift.<br />

Mine and mill samples will be initially dried in a large oven. High grade samples, such as<br />

c<strong>on</strong>centrate will be processed in a separate drying oven. Coarse samples will <strong>the</strong>n be crushed<br />

to -10 mesh and finally pulverized to 100% passing 100 mesh. High grade samples will be<br />

batch processed through <strong>the</strong> same equipment following a <strong>thor</strong>ough cleaning with sand.<br />

A 10 g sample of pulverized material will be split for assaying.<br />

Solid samples will be analysed using an INNOV-X X-5000 mobile XRF unit. It is estimated<br />

that 100 samples can be processed in a 10 hr shift. Two X-5000 machines will be required in<br />

order to maintain sufficient productivity and for backup.<br />

QA/QC standards will be developed for <strong>the</strong> laboratory including protocols for duplicates and for<br />

external checks.<br />

The sample preparati<strong>on</strong> and assay laboratory will require <strong>the</strong> services of a Chief Assayer, two<br />

sample preparati<strong>on</strong> technicians and an assayer for a total of four. Two such crews would be<br />

needed, <strong>on</strong>e <strong>on</strong> site and <strong>on</strong>e <strong>on</strong> a rest period.<br />

A metallurgical laboratory at Thor Lake will be used to prepare and test samples as part of<br />

m<strong>on</strong>itoring and improving <strong>the</strong> performance of <strong>the</strong> flotati<strong>on</strong> mill.<br />

Technical Report 43-101 – March 13, 2011 Page 18-41<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.