Table 18-12 Principal Process Design Criteria<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Principal Process Design Criteria<br />

General<br />

Processing rate – initial tpa 365,000<br />

tpd 1,000<br />

Processing rate – expansi<strong>on</strong> tpd 2,000<br />

Feed grade % ZrO 2 3.16<br />

% TREO 1.7<br />

% HREO 0.38<br />

% Nb 2 O 5 0.41<br />

% Ta 2 O 5 0.041<br />

Flotati<strong>on</strong> Plant<br />

Operating time hr/a 8,000<br />

Processing rate – initial tph 45.6<br />

Processing rate – expansi<strong>on</strong> tph 91.2<br />

(Ball mill, flotati<strong>on</strong> cells, gravity units, and filters added)<br />

Underground crusher product 100% passing mm 15<br />

Grinding circuit<br />

Final grind<br />

80% passing<br />

micrometres<br />

Rod and ball mill<br />

38<br />

Slimes-free n<strong>on</strong>-magnetics % feed 18<br />

Final c<strong>on</strong>centrate mass % feed 18<br />

Recovery to final c<strong>on</strong>centrate % ZrO 2 in feed 89.7<br />

% TREO in feed 79.5<br />

% HREO in feed 79.5<br />

% Nb 2 O 5 in feed 68.9<br />

% Ta 2 O 5 in feed 63<br />

Technical Report 43-101 – March 13, 2011 Page 18-37<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.