HEALTH AND SAFETY<br />

All crew will be issued TLDs to m<strong>on</strong>itor <strong>the</strong> exposure to radiati<strong>on</strong> in <strong>the</strong> work place. Records will<br />

be maintained and exposure limits will be set such that if workers are exposed to radiati<strong>on</strong><br />

above a certain limit <strong>the</strong>y will be moved to a different work area to reduce <strong>the</strong>ir exposure and to<br />

maintain safe working c<strong>on</strong>diti<strong>on</strong>s.<br />

In additi<strong>on</strong>, rad<strong>on</strong> and <strong>thor</strong><strong>on</strong> (rad<strong>on</strong> isotope produced by <strong>thor</strong>ium) levels within <strong>the</strong> mine and<br />

plant air would be m<strong>on</strong>itored to ensure that mine ventilati<strong>on</strong> is sufficient to reduce rad<strong>on</strong> and<br />

<strong>thor</strong><strong>on</strong> to acceptable c<strong>on</strong>centrati<strong>on</strong>s.<br />

Refuge stati<strong>on</strong>s will be installed in <strong>the</strong> vicinity of <strong>the</strong> most active work places and a sec<strong>on</strong>dary<br />

egress will be in place before producti<strong>on</strong> commences.<br />

Site crews will be trained in mine rescue procedures and a mine rescue stati<strong>on</strong> will be set up<br />

and equipped to resp<strong>on</strong>d to an emergency. The mine will purchase and maintain a set of BG-4<br />

breathing apparatus as well as SCBA’s for use <strong>on</strong> surface. Procedures for maintaining c<strong>on</strong>tact<br />

with o<strong>the</strong>r operating mines with regards to <strong>the</strong>ir mine rescue teams will be implemented.<br />

A diesel operated ambulance will be maintained at <strong>the</strong> site for use <strong>on</strong> surface and underground<br />

and a fully equipped first aid room will be set up and maintained and <strong>the</strong>re will be first aid<br />

coverage at <strong>the</strong> site at all times.<br />

Surface firefighting equipment will be kept <strong>on</strong> site and hydrants and hose stati<strong>on</strong>s for firefighting<br />

will be installed at strategic locati<strong>on</strong>s <strong>on</strong> surface.<br />

Emergency procedures as required under <strong>the</strong> Mining Regulati<strong>on</strong>s will be prepared and<br />

submitted for approval as required.<br />

FUTURE MINING<br />

The mining within this secti<strong>on</strong> is restricted to material that can be c<strong>on</strong>verted to proven or<br />

probable mineral reserves. In additi<strong>on</strong> to <strong>the</strong> resources extracted in <strong>the</strong> LOM presented above<br />

<strong>the</strong>re are significant measured, indicated and inferred resources within <strong>the</strong> Thor Lake Project.<br />

Additi<strong>on</strong>al mine planning and explorati<strong>on</strong> is recommended to permit <strong>the</strong> development of <strong>the</strong><br />

most efficient explorati<strong>on</strong> and exploitati<strong>on</strong> plan for <strong>the</strong> additi<strong>on</strong>al resources.<br />

Technical Report 43-101 – March 13, 2011 Page 18-34<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.