MINE DEVELOPMENT<br />

Mine development will commence with <strong>the</strong> development of <strong>the</strong> decline to <strong>the</strong> crusher elevati<strong>on</strong>.<br />

The advance will be single heading advance until <strong>the</strong> decline passes <strong>the</strong> first stope access ramp<br />

juncti<strong>on</strong>. The development required for mine development is shown in Table 18-10.<br />

Table 18-10 Life of Mine Development Schedule<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Total Lateral<br />

Development in<br />

Waste<br />

Total Lateral<br />

Development<br />

in Ore<br />

Total Lateral<br />

Development<br />

Total<br />

Raising<br />

(m) (m) (m) (m)<br />

Year -2 2,088 0 2,088 0<br />

Year -1 1,675 710 2,385 195<br />

Year 1 660 850 1,510 110<br />

Year 2 100 896 996 0<br />

Year 3 0 1,319 1,319 0<br />

Year 4 0 2,820 2,820 0<br />

Year 5 542 3,459 4,001 105<br />

Year 6 0 3,839 3,839 0<br />

Year 7 0 3,790 3,790 0<br />

Year 8 0 3,649 3,649 0<br />

Year 9 0 3,506 3,506 0<br />

Year 10 0 550 550 0<br />

Year 11 0 0 0 0<br />

Year 12 0 0 0 0<br />

Year 13 0 0 0 0<br />

Year 14 0 0 0 0<br />

Year 15 0 0 0 0<br />

Year 16 0 0 0 0<br />

Year 17 0 1,596 1,596 0<br />

Year 18 0 0 0 0<br />

Total 5,065 26,984 32,049 410<br />

The goal of <strong>the</strong> initial mine development will be to get to and develop <strong>the</strong> crusher stati<strong>on</strong> and to<br />

get to <strong>the</strong> base of <strong>the</strong> ventilati<strong>on</strong> raise. In <strong>the</strong> course of this development <strong>the</strong>re will be at least<br />

five primary stopes and five sec<strong>on</strong>dary stopes that will be available for producti<strong>on</strong> with<br />

Technical Report 43-101 – March 13, 2011 Page 18-31<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.