Communicati<strong>on</strong>s<br />

Mine communicati<strong>on</strong>s will c<strong>on</strong>sist of teleph<strong>on</strong>e service to <strong>the</strong> main mine switchboard as well as<br />

radio communicati<strong>on</strong>s through a leaky feeder system. The communicati<strong>on</strong>s system will also be<br />

used for m<strong>on</strong>itoring and c<strong>on</strong>trol of producti<strong>on</strong> equipment, ventilati<strong>on</strong>s systems, dewater and<br />

backfill.<br />

Explosives<br />

Det<strong>on</strong>ators, primers and stick powder will be stored in separate approved explosives magazines<br />

which will be located underground. If practical all of <strong>the</strong>se explosives will be stored in <strong>the</strong><br />

underground magazines to eliminate <strong>the</strong> need for surface explosives magazines.<br />

The main explosive planned for use at <strong>the</strong> TLP is ANFO which will be prepared <strong>on</strong> a batch basis<br />

from <strong>the</strong> combinati<strong>on</strong> of amm<strong>on</strong>ium nitrate and diesel oil in an approved ANFO mixing facility to<br />

be located within <strong>the</strong> mine. However, <strong>the</strong>re will still be a requirement for packaged slurry<br />

explosives and “stick” powder for wet holes or for boosting <strong>the</strong> ANFO in some applicati<strong>on</strong>s.<br />

These are easily provided by <strong>the</strong> explosives manufacturer in c<strong>on</strong>tainers which will be stored and<br />

inventoried underground.<br />

At a rate of 0.8 kg of ANFO per t<strong>on</strong>ne blasted <strong>the</strong> annual ANFO requirement is estimated to be<br />

292 t. An allowance of 10% of <strong>the</strong> total explosives for stick powder and package slurry is<br />

recommended for purchase and storage <strong>on</strong> site.<br />

An n<strong>on</strong> electric det<strong>on</strong>ati<strong>on</strong> system will be used with in <strong>the</strong> hole delays <strong>on</strong> all det<strong>on</strong>ators. A<br />

range of delay periods will be required and approximately 45,000 are required for a year of<br />

operati<strong>on</strong>.<br />

Sanitary System and Potable Water<br />

Potable water for <strong>the</strong> underground mine will be provided in specific c<strong>on</strong>tainers that will be<br />

resupplied regularly from <strong>the</strong> site potable water supply. Sanitary facilities in <strong>the</strong> mine will be<br />

approved self c<strong>on</strong>tained units,<br />

Road Maintenance<br />

Roadways will be maintained. A grader will be included in <strong>the</strong> equipment fleet for <strong>the</strong><br />

maintenance of underground roadways, <strong>the</strong> key focus will be <strong>on</strong> <strong>the</strong> stope access drifts and<br />

cross cuts as <strong>the</strong> main ramp is not planned to be a main haulage way and will <strong>the</strong>refore require<br />

less maintenance.<br />

Technical Report 43-101 – March 13, 2011 Page 18-30<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.