Paste Fill System<br />

A paste fill system is required to be in operati<strong>on</strong> in <strong>the</strong> fifth year of operati<strong>on</strong>s. There has been<br />

no specific testing of <strong>the</strong> tailings material to assess its suitability for use in paste fill at this time.<br />

Scott Wils<strong>on</strong> RPA recommends that a specificati<strong>on</strong> for <strong>the</strong> paste fill be developed and as so<strong>on</strong><br />

as tailings materials are available (from bulk tests or operati<strong>on</strong>s) a testing program should be<br />

undertaken.<br />

For this study Scott Wils<strong>on</strong> RPA has estimated that a cement additi<strong>on</strong> of 4% will be required for<br />

<strong>the</strong> fill for <strong>the</strong> primary stopes. The same cement additi<strong>on</strong> rate is planned for <strong>the</strong> sec<strong>on</strong>dary<br />

stopes to provide cement for <strong>the</strong> hydrati<strong>on</strong> of water so that water from backfill operati<strong>on</strong>s does<br />

not become an issue in <strong>the</strong> mine.<br />

There is not a large quantity of waste development forecast after <strong>the</strong> initial mine development<br />

but any waste from development will be used for filling sec<strong>on</strong>dary stopes.<br />

The annual cement requirement commencing year five of operati<strong>on</strong>s is <strong>the</strong>n 36,500 t<strong>on</strong>nes or<br />

1,825 c<strong>on</strong>tainers with bulk bags of cement powder.<br />

The mill expansi<strong>on</strong> includes a paste fill thickener in <strong>the</strong> mill. This will be supplemented with a<br />

filter system, mixing system and a c<strong>on</strong>crete pumping and distributi<strong>on</strong> system. Scott Wils<strong>on</strong> RPA<br />

has included c<strong>on</strong>siderati<strong>on</strong> of <strong>the</strong> use of foaming agents in <strong>the</strong> paste fill mix to reduce <strong>the</strong><br />

density slightly and to generate a product which is easy to pump.<br />

From <strong>the</strong> surface mixing plant <strong>the</strong> paste fill will be piped <strong>on</strong> surface to backfill distributi<strong>on</strong> holes<br />

for delivery to <strong>the</strong> stoping areas.<br />

MINE MAINTENANCE<br />

The larger maintenance work <strong>on</strong> <strong>the</strong> mine equipment will be competed in surface heavy<br />

equipment shops located within <strong>the</strong> main mill complex. This work will include all major repairs<br />

and major services. The surface shop will be used for <strong>the</strong> surface and underground mobile<br />

equipment at <strong>the</strong> site.<br />

Maintenance Bay<br />

A maintenance bay will be c<strong>on</strong>structed underground to accommodate underground vehicles for<br />

minor repairs and minor and intermediate service interval work. A level of parts and supplies for<br />

routine services and repairs will be maintained in <strong>the</strong> underground mine.<br />

Technical Report 43-101 – March 13, 2011 Page 18-28<br />