Table 18-8<br />

Mine Ventilati<strong>on</strong> Quantity at 1,000 TPD<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Units<br />

CFM<br />

Total<br />

CFM<br />

Usage<br />

CFM<br />

LHD- Development 6 m 3 2 18,000 36,000 0.6 21,600<br />

LHD- Producti<strong>on</strong> 6 m 3 2 18,000 36,000 0.6 21,600<br />

Jumbo 2 boom 2 7,000 14,000 0.5 7,000<br />

Bolting Jumbo 1 7,000 7,000 0.6 4,200<br />

Haul Trucks 30 to 40 t 3 25,000 75,000 0.5 37,500<br />

L<strong>on</strong>g Hole Drill 0 7,000 - 0.2 -<br />

Scissor Lift 2 7,000 14,000 0.5 7,000<br />

Grader 1 7,000 7,000 0.5 3,500<br />

Utility Truck 2 7,000 14,000 0.5 7,000<br />

ANFO Loader 1 7,000 7,000 0.5 3,500<br />

Man Carrier 2 5,000 10,000 0.5 5,000<br />

Mechanic's Vehicle 1 5,000 5,000 0.5 2,500<br />

Electrician’s Vehicle 1 5,000 5,000 0.5 2,500<br />

Service Truck 1 5,000 5,000 0.5 2,500<br />

Crusher/C<strong>on</strong>veyor Service 1 5,000 5,000 0.5 2,500<br />

Light Vehicles 6 4,000 24,000 0.5 12,000<br />

Tractor/Back Hoe 1 5,000 5,000 0.5 2,500<br />

Bobcat 1 5,000 5,000 0.5 2,500<br />

Tool Handler 1 7,000 7,000 0.5 3,500<br />

Portable Compressors 3 3,000 9,000 0.5 4,500<br />

Air Drills/Stopers<br />

Lot<br />

Total 290,000 152,900<br />

Losses 0.2 30,580<br />

Requirement 183,480<br />

Rounded To 200,000<br />

Mine ventilati<strong>on</strong> air will enter <strong>the</strong> fresh air raise and be pushed to <strong>the</strong> lower levels of <strong>the</strong> mine<br />

where it will be split to feed <strong>the</strong> producti<strong>on</strong> levels and <strong>the</strong> crushing plant. The air flow will be<br />

regulated to provide appropriate ventilati<strong>on</strong> airflows to <strong>the</strong> working areas. The exhaust air will<br />

recombine in <strong>the</strong> access decline and be exhausted to surface.<br />

At this time it has been assumed that <strong>the</strong> presence of rad<strong>on</strong> and <strong>thor</strong><strong>on</strong> gas from <strong>the</strong> rock will<br />

not be an issue and will be appropriately diluted and exhausted with <strong>the</strong> mine air. Procedures<br />

Technical Report 43-101 – March 13, 2011 Page 18-23<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.