Equipment will be selected based up<strong>on</strong> price and support and it is planned to purchase as many<br />

units as possible from <strong>on</strong>e supplier to minimize <strong>the</strong> number of suppliers and to increase <strong>the</strong><br />

level of comm<strong>on</strong> spares to <strong>the</strong> extent possible.<br />

The expansi<strong>on</strong> to <strong>the</strong> producti<strong>on</strong> rate will necessitate <strong>the</strong> additi<strong>on</strong> of several units to <strong>the</strong> mobile<br />

equipment fleet as shown in Table 18-5.<br />

Table 18-5<br />

Additi<strong>on</strong>al Underground Mobile Equipment at 2,000 TPD<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Size<br />

Additi<strong>on</strong>al Units Required<br />

LHD- Development 6 m 3 1<br />

LHD- Producti<strong>on</strong> 6 m 3 1<br />

Jumbo 2 boom 1<br />

Bolting Jumbo 1<br />

Haul Trucks 30 to 40 t 2<br />

L<strong>on</strong>g Hole Drill 1<br />

Scissor Lift 1<br />

Utility Truck 1<br />

ANFO Loader 1<br />

MINE INFRASTRUCTURE<br />

Crushing and C<strong>on</strong>veying<br />

The mine crushing will take place underground in a set of chambers excavated to form <strong>the</strong><br />

crushing and screening plant. Ore will be dumped <strong>on</strong> <strong>the</strong> 85 m level into a single dump point<br />

feeding <strong>the</strong> crusher. The dump will be equipped with a grizzly and rock breaker and will also be<br />

fed with <strong>the</strong> ore pass from <strong>the</strong> upper producti<strong>on</strong> level (116 m RL). Below <strong>the</strong> lower level dump<br />

<strong>the</strong>re will be 500 t of ore capacity.<br />

At <strong>the</strong> crusher feed <strong>the</strong>re will be a chute and a set of c<strong>on</strong>trol chains ahead of <strong>the</strong> vibrating<br />

grizzly feeding <strong>the</strong> jaw crusher. The crushing circuit is described in more detail in secti<strong>on</strong> 18.<br />

The primary crusher will be located in a chamber that is 10 m by 14 m by 10 m high with a floor<br />

elevati<strong>on</strong> of 40 m. The screening will take place in a sec<strong>on</strong>d 9 m by 7 m by 8 m high chamber<br />

c<strong>on</strong>nected to <strong>the</strong> primary crushing chamber by a vehicle access way <strong>on</strong> <strong>the</strong> bottom level and a<br />

c<strong>on</strong>veyor gallery from <strong>the</strong> primary crusher. There will also be a c<strong>on</strong>veyor gallery at <strong>the</strong> floor<br />

elevati<strong>on</strong> to <strong>the</strong> top of <strong>the</strong> fine ore bin.<br />

Technical Report 43-101 – March 13, 2011 Page 18-18<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.