UNDERGROUND MOBILE EQUIPMENT<br />

The underground mining fleet will c<strong>on</strong>sist of <strong>the</strong> units as shown in Table 18-4 for <strong>the</strong> mine<br />

development, producti<strong>on</strong> and ancillary operati<strong>on</strong>s.<br />

Table 18-4<br />

Underground Mobile Equipment at 1,000 TPD<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Size<br />

Units Required at<br />

1,000 tpd<br />

LHD- Development 6 m 3 2<br />

LHD- Producti<strong>on</strong> 6 m 3 2<br />

Jumbo 2 boom 2<br />

Bolting Jumbo 1<br />

Haul Trucks 30 to 40 t 3<br />

L<strong>on</strong>g Hole Drill 0<br />

Scissor Lift 2<br />

Grader 1<br />

Utility Truck 2<br />

ANFO Loader 1<br />

Man Carrier 2<br />

Mechanic's Vehicle 1<br />

Electrician’s Vehicle 1<br />

Service Truck 1<br />

Crusher/C<strong>on</strong>veyor Service 1<br />

Light Vehicles 6<br />

Tractor/Back Hoe 1<br />

Bobcat 1<br />

Tool Handler 1<br />

Portable Compressors 3<br />

Most of <strong>the</strong> mine equipment will be needed at <strong>the</strong> start up however <strong>the</strong> l<strong>on</strong>ghole drill has been<br />

deferred to year 11. The LHD’s, trucks and jumbos will be required for <strong>the</strong> mine development<br />

and will be utilized by c<strong>on</strong>tractors for <strong>the</strong> preproducti<strong>on</strong> period. In operati<strong>on</strong>s <strong>the</strong>se units are<br />

expected to experience relatively low utilizati<strong>on</strong> but <strong>the</strong> fleet size is c<strong>on</strong>sidered necessary to<br />

provide <strong>the</strong> back up for this remote site operati<strong>on</strong>.<br />

Technical Report 43-101 – March 13, 2011 Page 18-17<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!