Until <strong>the</strong> crusher is in place and <strong>the</strong> c<strong>on</strong>veyor is in service all ore will be hauled to surface using<br />

low profile haul trucks. Development waste will also be hauled to surface in <strong>the</strong> same manner<br />

through this period.<br />

After <strong>the</strong> crusher and c<strong>on</strong>veyor are in place <strong>the</strong> ore will be transported to surface by c<strong>on</strong>veyor.<br />

Development waste will ei<strong>the</strong>r be hauled to surface, crushed and c<strong>on</strong>veyed to surface, or<br />

diverted to stopes for use as fill combined with <strong>the</strong> planned paste backfill.<br />

The annual haulage requirements are shown in Table 18-3.<br />

Table 18-3<br />

Annual Haulage Distance and T<strong>on</strong>nage<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

T<strong>on</strong>nage One way haul<br />

‘000 t Metres<br />

Year 1 335 403<br />

Year 2 365 294<br />

Year 3 419 388<br />

Year 4 730 446<br />

Year 5 730 368<br />

Year 6 730 414<br />

Year 7 730 391<br />

Year 8 730 374<br />

Year 9 730 412<br />

Year 10 730 393<br />

Year 11 730 356<br />

Year 12 730 420<br />

Year 13 730 300<br />

Year 14 730 492<br />

Year 15 730 417<br />

Year 16 730 352<br />

Year 17 730 412<br />

Year 18 675 78<br />

Total 12,014 375<br />

Technical Report 43-101 – March 13, 2011 Page 18-14<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.