Table 18-2<br />

Development T<strong>on</strong>nage Breakdown<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Resource Class T<strong>on</strong>nage<br />

TREO NMR<br />

‘000 t ppm TREO $/t<br />

Inferred > C$300/t 62 15,425 489<br />

Inferred < C$300/t 67 7,467 210<br />

Indicated > C$300/t 29 16,521 550<br />

Indicated < C$300/t 1 6,856 232<br />

No Class $0/t 135 0 0<br />

Total 294 6,604 206<br />

STOPING<br />

Z<strong>on</strong>es less than 18 m high<br />

Stopes will be mined in a primary and sec<strong>on</strong>dary sequence. Primary stopes will be 15 m wide,<br />

while <strong>the</strong> sec<strong>on</strong>dary stopes will be 16 m wide to leave extra space and ensure <strong>the</strong> maintenance<br />

of good ground c<strong>on</strong>diti<strong>on</strong>s in <strong>the</strong> sec<strong>on</strong>dary extracti<strong>on</strong> sequence. There will be a <strong>on</strong>e metre skin<br />

between primary and sec<strong>on</strong>dary stopes to minimize backfill diluti<strong>on</strong>. For mineralized z<strong>on</strong>es up<br />

to 18 m high <strong>the</strong> stopes will be excavated in an overhand cut and fill sequence in <strong>on</strong>e lift. Each<br />

cut will be developed using a 5 m by 5 m heading followed by <strong>the</strong> slashing of walls resulting in a<br />

15 m by 5 m cut. Adjacent primary stopes will be developed simultaneously in a progressing<br />

chevr<strong>on</strong> pattern. The sec<strong>on</strong>d lift will begin <strong>on</strong>ce <strong>the</strong> undercuts have been filled with paste.<br />

Primary stopes will be developed with a 5 m wide by 5 m high central drive followed by two 5 m<br />

wide slashes to attain <strong>the</strong> planned 15 m width. For stopes up to 18 m high <strong>the</strong> stope<br />

development will commence at <strong>the</strong> top elevati<strong>on</strong> and subsequent lifts will be taken by benching<br />

<strong>the</strong> floor using <strong>the</strong> development jumbos.<br />

Development of sec<strong>on</strong>dary stopes will begin <strong>on</strong>ce <strong>the</strong> adjacent primary stopes have been filled.<br />

The sec<strong>on</strong>dary stopes will be developed with a 5 to 6 m wide drift down <strong>the</strong> center of <strong>the</strong> stope<br />

and <strong>the</strong> remaining width will be slashed and remote mucked. In <strong>the</strong> sec<strong>on</strong>dary stopes a <strong>on</strong>e<br />

metre thick skin will be left <strong>on</strong> each side to reduce <strong>the</strong> amount of diluti<strong>on</strong> from backfill. In <strong>the</strong><br />

course of blasting it is assumed that a porti<strong>on</strong> of <strong>the</strong> skin will fail and <str<strong>on</strong>g>report</str<strong>on</strong>g> to <strong>the</strong> muck pile.<br />

Z<strong>on</strong>es over 18 m high<br />

For z<strong>on</strong>es in excess of 18 m high <strong>the</strong> stopes will again be developed in a primary – sec<strong>on</strong>dary<br />

sequence with <strong>the</strong> same widths as above (Figures 18-6 and 18-7). However, for sec<strong>on</strong>dary<br />

stopes, <strong>the</strong> ore will be extracted by l<strong>on</strong>g hole stoping. The top cut will be developed to <strong>the</strong> full<br />

Technical Report 43-101 – March 13, 2011 Page 18-12<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.