Figure 18-5 Mine Development Schematic<br />

Ventilati<strong>on</strong> raises between <strong>the</strong> working levels will be driven as needed. The main ventilati<strong>on</strong><br />

intake will be at <strong>the</strong> west end of <strong>the</strong> stoping area. The intake shaft will have a cross secti<strong>on</strong>al<br />

area of 12 m 2 and will be driven by Alimak or raise bored depending up<strong>on</strong> <strong>the</strong> availability of<br />

equipment and c<strong>on</strong>tractors. The raise will include a ladder way as a sec<strong>on</strong>d egress.<br />

Additi<strong>on</strong>al ventilati<strong>on</strong> raises will be developed at <strong>the</strong> ends of <strong>the</strong> east and west ramps to provide<br />

exhaust ways for mine ventilati<strong>on</strong> air to <strong>the</strong>se areas.<br />

Technical Report 43-101 – March 13, 2011 Page 18-10<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.