30.01.2015 Views

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The c<strong>on</strong>veyor decline will c<strong>on</strong>tinue <strong>on</strong> down to <strong>the</strong> 40 m elevati<strong>on</strong> where access will be driven<br />

into <strong>the</strong> crushing and screening chambers. Excavati<strong>on</strong>s for lunch rooms, electrical equipment,<br />

lubricants and materials storage will also be driven in <strong>the</strong> area.<br />

The c<strong>on</strong>veyor gallery will be c<strong>on</strong>tinued down to <strong>the</strong> 20 m elevati<strong>on</strong> with <strong>the</strong> excavati<strong>on</strong> of a<br />

pump stati<strong>on</strong> and an electrical bay immediately below <strong>the</strong> c<strong>on</strong>veyor feed area. Below <strong>the</strong><br />

c<strong>on</strong>veyor feed locati<strong>on</strong> <strong>the</strong> decline will be driven to <strong>the</strong> 18 m elevati<strong>on</strong> at which point two sumps<br />

will be driven for water collecti<strong>on</strong> and pumping. The sumps will be designed for <strong>the</strong> removal of<br />

sludge by LHD and <strong>the</strong> sumps will operate with <strong>on</strong>e in service at any given time lifting water to<br />

<strong>the</strong> main discharge pump.<br />

Immediately below <strong>the</strong> c<strong>on</strong>veyor transfer point a stope access ramp will be driven and upgraded<br />

to provide access to <strong>the</strong> upper elevati<strong>on</strong>s of <strong>the</strong> stoping horiz<strong>on</strong> and a sec<strong>on</strong>d ramp will be<br />

driven to <strong>the</strong> lower mineralized elevati<strong>on</strong>s.<br />

UNDERGROUND LAYOUT<br />

Stope access headings will be driven off three access ramps as shown in Figure 18-5. The<br />

ramps are required to access <strong>the</strong> various stope elevati<strong>on</strong>s necessitated by <strong>the</strong> variati<strong>on</strong>s in <strong>the</strong><br />

elevati<strong>on</strong> of <strong>the</strong> footwall of <strong>the</strong> Basal Z<strong>on</strong>e. The access development ramp and stope access<br />

headings will be driven as 5 m by 5 m headings and ramp grades will be limited to 15%. The<br />

three access ramps are named Ramp West, Ramp East and Ramp North. Ramp North and<br />

Ramp East will be c<strong>on</strong>nected to Ramp West with haulage drifts and <strong>the</strong> drift c<strong>on</strong>necting Ramp<br />

West with Ramp North would have access to <strong>the</strong> ore pass.<br />

Table 18-1 shows <strong>the</strong> various development sizes and lengths, and Table 18-2 shows a<br />

breakdown of development t<strong>on</strong>nage by value.<br />

Ground Support<br />

Ground support for development would be 6’ to 8’ split sets or Swellex, installed by rock bolting<br />

jumbo.<br />

Technical Report 43-101 – March 13, 2011 Page 18-9<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.