Figure 18-3<br />

Stability Graph<br />

Main Decline<br />

The main access ramp will be driven from a locati<strong>on</strong> near <strong>the</strong> mill at a grade of -15%. From<br />

surface to a locati<strong>on</strong> below <strong>the</strong> fine ore bin <strong>the</strong> main access will be approximately 1,600 m in<br />

length. The decline design includes <strong>on</strong>e transfer point for <strong>the</strong> c<strong>on</strong>veyor. The mine layout is<br />

shown in Figure 18-4. The decline will be driven as a 6.5 m high by 5 m wide to accommodate<br />

<strong>the</strong> overhead c<strong>on</strong>veyor system and access to men and equipment.<br />

Technical Report 43-101 – March 13, 2011 Page 18-7<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.