30.01.2015 Views

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

18. OTHER RELEVANT DATA AND<br />

INFORMATION<br />

The text below is largely from <strong>the</strong> Scott Wils<strong>on</strong> RPA <str<strong>on</strong>g>report</str<strong>on</strong>g> (2010) as Aval<strong>on</strong> has not completed<br />

additi<strong>on</strong>al engineering work <strong>on</strong> <strong>the</strong> mining process, infrastructure or ec<strong>on</strong>omics at this time.<br />

The PFS assumes that <strong>the</strong> ore will be c<strong>on</strong>centrated at Thor Lake and barged across <strong>the</strong> Great<br />

Slave Lake (GSL) to Pine Point for hydrometallurgical processing. The layout of <strong>the</strong> two sites<br />

are shown in Figures 18-1 and 18-2.<br />

MINING OPERATIONS<br />

Underground mining of <strong>the</strong> Indicated Resource of <strong>the</strong> Basal Z<strong>on</strong>e was investigated for <strong>the</strong> prefeasibility<br />

study. The study included mine design, producti<strong>on</strong> scheduling, selecti<strong>on</strong> of equipment,<br />

estimates of ventilati<strong>on</strong>, heating, pumping backfill, fuel, and labour requirements, and<br />

preparati<strong>on</strong> of cost estimates for use in a cash flow and to support Probable Mineral Reserves.<br />

MINING METHOD<br />

The majority of <strong>the</strong> Indicated Resource of <strong>the</strong> Thor Lake <strong>deposit</strong> lies directly beneath and to <strong>the</strong><br />

north of L<strong>on</strong>g Lake approximately 180 m below surface. The mineralizati<strong>on</strong> does exist from<br />

near surface downwards however <strong>the</strong> highest grades exist at <strong>the</strong> bottom of <strong>the</strong> <strong>deposit</strong> at <strong>the</strong><br />

base of <strong>the</strong> Basal Z<strong>on</strong>e. Open pit mining has not been c<strong>on</strong>sidered in any detail due to <strong>the</strong> lower<br />

grades near surface and <strong>the</strong> magnitude of <strong>the</strong> surface disturbance which was unacceptable to<br />

Aval<strong>on</strong> and was c<strong>on</strong>sidered to be a major impediment to obtaining permits. The <strong>deposit</strong> is<br />

planned to be mined using underground mining methods.<br />

Access to <strong>the</strong> <strong>deposit</strong> will be through a ramp collared to <strong>the</strong> west of L<strong>on</strong>g Lake. The<br />

Nechalacho <strong>deposit</strong> is planned to be mined by underground methods to access <strong>the</strong> higher<br />

grade resources at <strong>the</strong> base of <strong>the</strong> <strong>deposit</strong> and to minimize <strong>the</strong> surface disturbance. Ground<br />

c<strong>on</strong>diti<strong>on</strong>s are expected to be good and primary stopes are expected to be stable at widths of<br />

15 m. In light of <strong>the</strong> high value of <strong>the</strong> resources in <strong>the</strong> Basal Z<strong>on</strong>e, <strong>the</strong> use of back fill is<br />

proposed and mining will be d<strong>on</strong>e with a first pass of primary stopes followed by pillar extracti<strong>on</strong><br />

after <strong>the</strong> primary stopes have been filled.<br />

Technical Report 43-101 – March 13, 2011 Page 18-1<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!