30.01.2015 Views

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

grades were based up<strong>on</strong> <strong>the</strong> grades within <strong>the</strong> resource model for <strong>the</strong> areas extracted. These<br />

include approximately 15% diluti<strong>on</strong> in <strong>the</strong> form of material below <strong>the</strong> cut-off value of C$260/t<br />

(mostly in <strong>the</strong> hanging wall) and material that is not classified as Indicated Resources (mostly in<br />

<strong>the</strong> footwall).<br />

Unplanned diluti<strong>on</strong> will be incurred mainly from <strong>the</strong> small failures that are expected to occur at<br />

<strong>the</strong> stope edges and have not been included in <strong>the</strong> mineral reserve estimate. Sec<strong>on</strong>dary stopes<br />

were designed with a 1 m skin of ore left <strong>on</strong> each wall to minimize diluti<strong>on</strong> from backfill. This<br />

skin is assumed to be lost in <strong>the</strong> mining plan but in fact some porti<strong>on</strong> of <strong>the</strong> skin will be<br />

recovered in <strong>the</strong> mining process.<br />

Extracti<strong>on</strong> within <strong>the</strong> stopes was assumed to be 100%.<br />

CONCLUSIONS<br />

Mineral resources that are not mineral reserves and do not have dem<strong>on</strong>strated ec<strong>on</strong>omic<br />

viability.<br />

The stated mineral resources are not materially affected by any known envir<strong>on</strong>mental,<br />

permitting, legal, title, taxati<strong>on</strong>, socio-ec<strong>on</strong>omic, marketing, political or o<strong>the</strong>r relevant issues, to<br />

<strong>the</strong> best knowledge of <strong>the</strong> au<strong>thor</strong>s. There are no known mining, metallurgical, infrastructure, or<br />

o<strong>the</strong>r factors that materially affect this mineral resource estimate, at this time.<br />

The reserve estimate has not been updated in this <str<strong>on</strong>g>report</str<strong>on</strong>g>, and it is <strong>the</strong> au<strong>thor</strong>’s opini<strong>on</strong> that <strong>the</strong><br />

estimati<strong>on</strong> completed by Scott Wils<strong>on</strong> RPA can be relied up<strong>on</strong> until an updated reserve is<br />

completed, which is a recommendati<strong>on</strong> of this <str<strong>on</strong>g>report</str<strong>on</strong>g>. Such an updated reserve estimate would<br />

include a new mine plan.<br />

Technical Report 43-101 – March 13, 2011 Page 17-27<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!