30.01.2015 Views

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The recoveries estimated for <strong>the</strong> flotati<strong>on</strong> plant and for <strong>the</strong> hydrometallurgical plant are listed in<br />

Table 17-13.<br />

The 3% NSR was estimated based up<strong>on</strong> <strong>the</strong> value of producti<strong>on</strong> less <strong>the</strong> hydrometallurgical<br />

costs and transportati<strong>on</strong>. The hydrometallurgy plant costs include an allowance for <strong>the</strong><br />

depreciati<strong>on</strong> of <strong>the</strong> capital costs over <strong>the</strong> total units of planned producti<strong>on</strong>.<br />

Table 17-13 Recovery Assumpti<strong>on</strong>s for Reserve Estimate<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

Feed to<br />

C<strong>on</strong>centrate<br />

C<strong>on</strong>centrate to<br />

Product<br />

Net<br />

Recovery<br />

ZrO 2 89.7% 90.0% 80.7%<br />

TREO 79.5% 93.0% 73.9%<br />

HREO 79.5% 93.0% 73.9%<br />

Nb 2 O 5 68.9% 80.0% 55.1%<br />

Ta 2 O 5 63.0% 50.0% 31.5%<br />

An allowance of 0.03% of <strong>the</strong> product weight was deducted as losses in transit c<strong>on</strong>sidering <strong>the</strong><br />

number of times that <strong>the</strong> products will be handled between <strong>the</strong> c<strong>on</strong>centrator and <strong>the</strong> final<br />

customer.<br />

The prices used for <strong>the</strong> cut off grade analysis are listed in Table 17-14 and <strong>the</strong> operating costs<br />

are based <strong>on</strong> <strong>the</strong> LOM average operating cost estimate and are shown in Table 17-15. An<br />

exchange rate of USD = 1.11 CAD was used in <strong>the</strong> analysis.<br />

Table 17-14 Product Prices for Cut-Off Grade<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

US$/kg<br />

TREO 21.94<br />

Nb 2 O 5 45.00<br />

Ta 2 O 5 130.00<br />

ZrO 2 3.77<br />

The applicati<strong>on</strong> of <strong>the</strong> product prices, recoveries and exchange rate were used to calculate <strong>the</strong><br />

value of each block within <strong>the</strong> resource model. An NMR of C$300/t<strong>on</strong>ne was applied as <strong>the</strong> cutoff<br />

grade in <strong>the</strong> stope design. The calculated cut-off ore value using <strong>the</strong> factors noted above is<br />

an average of C$267 per t<strong>on</strong>ne.<br />

Technical Report 43-101 – March 13, 2011 Page 17-25<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!