MINERAL RESERVES<br />

The current Mineral Reserve estimate for <strong>the</strong> Thor Lake Project has been prepared by Scott<br />

Wils<strong>on</strong> RPA (2010) as outlined in Table 17-12. The Mineral Reserve is based up<strong>on</strong><br />

underground mining of <strong>the</strong> <strong>deposit</strong>. The Mineral Reserves were all c<strong>on</strong>verted from Mineral<br />

Resources and no Inferred Mineral Resources were c<strong>on</strong>verted to Mineral Reserves. The<br />

Mineral Resource utilized for development of <strong>the</strong> mine plan and reserves is that of <strong>the</strong> <str<strong>on</strong>g>report</str<strong>on</strong>g> of<br />

Scott Wils<strong>on</strong> RPA (2010). Aval<strong>on</strong> has not updated this Mineral Reserve to reflect <strong>the</strong> updated<br />

resources, but this work is in progress.<br />

Where inferred mineral resources are included within <strong>the</strong> stope boundaries of <strong>the</strong> mine plan <strong>the</strong><br />

material has been treated as diluti<strong>on</strong>.<br />

Table 17-12 Mineral Reserves<br />

Aval<strong>on</strong> Rare Metals Inc. – Thor Lake Project<br />

T<strong>on</strong>nes<br />

(milli<strong>on</strong>s)<br />

% TREO % HREO % ZrO 2 % Nb 2 O 5 % Ta 2 O 5<br />

Probable<br />

Reserves<br />

Basal Z<strong>on</strong>e 12.01 1.70 0.38 3.16 0.41 0.041<br />

Total<br />

Probable<br />

Reserves<br />

12.01 1.70 0.38 3.16 0.41 0.041<br />

Notes:<br />

1. CIM definiti<strong>on</strong>s were followed for Mineral Reserves.<br />

2. Mineral Reserves are estimated using price forecasts for 2014 for rare earth oxides (US$21.94/kg average), zirc<strong>on</strong>ium<br />

oxide (US$3.76/kg), tantalum oxide (US$130/kg) and niobium oxide (US$45/kg), which are significantly above current<br />

prices.<br />

3. HREO grade comprises Y 2O 3, Eu 2O 3, Gd 2O 3, Tb 2O 3, Dy 2O 3, Ho 2O 3, Er 2O 3, Tm 2O 3, Yb 2O 3, and Lu 2O 3. TREO grade<br />

comprises all HREO and La 2O 3, Ce 2O 3, Nd 2O 3, Pr 2O 3, and Sm 2O 3.<br />

4. An exchange rate of C$1.11/US$1 was used.<br />

5. Mineral Reserves are estimated using a Net Metal Return (NMR) cut-off value of C$260/t.<br />

6. A minimum mining width of five metres was used.<br />

7. Totals may differ from sum or weighted sum of numbers due to rounding.<br />

CUT-OFF GRADE<br />

There are several payable products from <strong>the</strong> Thor Lake <strong>project</strong>, <strong>the</strong>se include <strong>the</strong> TREO product<br />

and c<strong>on</strong>centrates c<strong>on</strong>taining niobium, tantalum and zirc<strong>on</strong>ium. The cut-off grade for <strong>the</strong> design<br />

of <strong>the</strong> stopes was <strong>the</strong>refore based up<strong>on</strong> an NMR per t<strong>on</strong>ne. The NMR per t<strong>on</strong>ne was based<br />

up<strong>on</strong> <strong>the</strong> estimated prices for <strong>the</strong> products after allowance for recovery at <strong>the</strong> flotati<strong>on</strong> plant and<br />

<strong>the</strong> hydrometallurgical plant less <strong>the</strong> operating costs associated with <strong>the</strong> producti<strong>on</strong> of products.<br />

Technical Report 43-101 – March 13, 2011 Page 17-24<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.