30.01.2015 Views

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 18-9 Mine Ventilati<strong>on</strong> Quantity at 2,000 TPD ...................................................18-25<br />

Table 18-10<br />

Life of Mine Development Schedule........................................................18-31<br />

Table 18-11 Mine Producti<strong>on</strong> Forecast ......................................................................18-33<br />

Table 18-12<br />

Principal Process Design Criteria............................................................18-37<br />

Table 18-12 (C<strong>on</strong>t’d) Principal Process Design Criteria ...............................................18-38<br />

Table 18-13 Power Demand .....................................................................................18-52<br />

Table 18-14<br />

Table 18-15<br />

Table 18-16<br />

Table 18-17<br />

Annual Reagent Needs..........................................................................18-58<br />

Surface Equipment Fleet........................................................................18-60<br />

Hydrometallurgical Plant Electrical Load..................................................18-68<br />

Surface Mobile Equipment at Pine Point..................................................18-70<br />

Table 18-18 Distributi<strong>on</strong> of Rare Earths by Source –China ..........................................18-75<br />

Table 18-18 Rare Earth supply – 2008.......................................................................18-76<br />

Table 18-20 Rare Earth Demand by Applicati<strong>on</strong> and Regi<strong>on</strong> – 2008.............................18-78<br />

Table 18-21 Supply and Demand for Rare Earths 2014 – 2015....................................18-79<br />

Table 18-22 Proposed New REO Proejcts (Excluding Aval<strong>on</strong>) 2010 – 2014 ..................18-80<br />

Table 18-23<br />

Table 18-24<br />

Table 18-25<br />

Table 18-26<br />

Table 18-27<br />

2010 Versus 2014 FOB Prices for REO...................................................18-83<br />

World Niobium Producti<strong>on</strong>......................................................................18-85<br />

Historic Chinese Export Price for Zirc<strong>on</strong>ia................................................18-90<br />

Prices for Zirc<strong>on</strong>ium Oxychloride, China (36% Min. C<strong>on</strong>tained ZRO2)........18-90<br />

Zirc<strong>on</strong>ia Prices, FOB China....................................................................18-91<br />

Table 18-28 Closure Cost Estimate .........................................................................18-107<br />

Table 18-29<br />

NWT Mining Royalty............................................................................18-108<br />

Table 18-30 Capital Cost Estimate ..........................................................................18-109<br />

Technical Report 43-101 – March 13, 2011<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.<br />

Page xi

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!