30.01.2015 Views

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

downgraded to inferred irrespective of distance to a drill hole. The procedure is outlined in Table<br />

17-11<br />

Figure 17-6 Ore Z<strong>on</strong>es by Domain<br />

Thor<br />

Lake<br />

West<br />

L<strong>on</strong>g<br />

Lake<br />

Tardiff<br />

Lake<br />

Table 17-11 Reclassificati<strong>on</strong> of Resource Categories<br />

Aval<strong>on</strong> Rare Metals Inc. – Nechalacho Deposit<br />

Reclassificati<strong>on</strong> Reclassificati<strong>on</strong> Reclassificati<strong>on</strong><br />

Classificati<strong>on</strong> of Resources MineSight Class West L<strong>on</strong>g Lake Tardiff Lake Thor Lake<br />

0-25m basal Measured Indicated Indicated Inferred<br />

0-25m upper - 2 hole min. Measured Indicated Indicated Inferred<br />

25-60m basal Indicated Indicated Indicated Inferred<br />

25-60m upper -2 hole min. Indicated Indicated Indicated Inferred<br />

60-240m basal Inferred Inferred Inferred Inferred<br />

60-240m upper - 2 hole min. Inferred Inferred Inferred Inferred<br />

RESOURCE ESTIMATE<br />

The Mineral Resource estimate summarized at <strong>the</strong> start of this secti<strong>on</strong> is <str<strong>on</strong>g>report</str<strong>on</strong>g>ed by individual<br />

rare earth oxide comp<strong>on</strong>ents in <strong>the</strong> following tables.<br />

Technical Report 43-101 – March 13, 2011 Page 17-18<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!