30.01.2015 Views

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

technical report on the nechalacho deposit, thor lake project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

was equal to 60 m by 60 m by 30 m and <strong>the</strong> sec<strong>on</strong>d pass was 240 m by 240 m by 120 m. The<br />

shorter range is perpendicular to <strong>the</strong> plane of <strong>the</strong> mineralized z<strong>on</strong>e and interpolati<strong>on</strong> was<br />

performed <strong>on</strong> <strong>the</strong> un-wrinkled/flattened z<strong>on</strong>es. The details and comparis<strong>on</strong> to previous resource<br />

calculati<strong>on</strong>s are listed in Table 17-10.<br />

Table 17-10 Calculati<strong>on</strong> Metal Values<br />

Aval<strong>on</strong> Rare Metals Inc. – Nechalacho Deposit<br />

Comparis<strong>on</strong> of Methods Wardrop SWRPA Aval<strong>on</strong><br />

Capping no no no<br />

Calculati<strong>on</strong> Type kriged IDW 2 IDW 2<br />

Composite Length 2.5 m 2.0 m 2.0 m<br />

Flattening of Holes yes yes no<br />

Search Ellipsoid 1 60x60x30 60x60x10 60x60x30*<br />

Minimum composites/hole 4 4 4<br />

Total composites/hole 15 15 8<br />

Max composites/hole 3 15 3<br />

Search Ellipsoid 2<br />

120x120x60 120x120x20 60x60x30**<br />

Minimum composites/hole 3 4 4<br />

Total composites/hole 15 15 8<br />

Max composites/hole 15 15 8<br />

Search Ellipsoid 3<br />

240x240x120 240x240x30 240x240x120<br />

Minimum composites/hole 3 4 3<br />

Total composites/hole 15 15 15<br />

Max composites/hole 15 15 15<br />

total composites 7,164 10,574 19,393<br />

number of holes used 91 206 291<br />

*= upper<br />

**=basal<br />

RESOURCE CLASSIFICATION<br />

A distance model was created by Aval<strong>on</strong> and subsequently fur<strong>the</strong>r delineated using a manual<br />

clipping routine to regi<strong>on</strong>ally define three regi<strong>on</strong>s or domains of c<strong>on</strong>tiguous or near-c<strong>on</strong>tiguous<br />

mineralizati<strong>on</strong> at a cut-off value of C$260/t<strong>on</strong>ne. MineSight was used to define “ore types”<br />

based <strong>on</strong> distance to a diam<strong>on</strong>d drill hole and in <strong>the</strong> case of Upper Z<strong>on</strong>e mineralizati<strong>on</strong> whe<strong>the</strong>r<br />

it met a two hole minimum for “measured and indicated”. All measured (as defined as 25m<br />

distance to a drill hole) was <strong>the</strong>n downgraded to indicated. Indicated was limited to a maximum<br />

of 60 meters to a drill hole (and more than 25 meters). The <strong>deposit</strong> was broken into three<br />

domains as shown in Fig.17-6. All mineralizati<strong>on</strong> within <strong>the</strong> Thor Lake boundary was also<br />

Technical Report 43-101 – March 13, 2011 Page 17-17<br />

Prepared by Aval<strong>on</strong> Rare Metals Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!