SECURING OUR FUTURE<br />

ORE RESERVE AND MINERAL RESOURCE ESTIMATES<br />

as at 31 December <strong>2011</strong><br />

MINERAL RESOURCES BY PROJECT<br />

Mineral Resources inclusive of Ore Reserves (3E)<br />

The figures in the table below represent <strong>Anglo</strong> <strong>American</strong> Platinum Limited’s (Amplats) attributable interests:<br />

Resources<br />

Contained<br />

Project million Grade Grade Grade Contained 3E million<br />

(AAPL interest) tonnes 3E g/t % Cu % Ni 3E tonnes troy ounces<br />

SOUTH AFRICA<br />

Boikgantsho Project Measured<br />

(49%)* Indicated 37.0 1.30 0.07 0.11 47.9 1.5<br />

Measured <strong>and</strong> Indicated 37.0 1.30 0.07 0.11 47.9 1.5<br />

Inferred 1.8 1.14 0.04 0.08 2.1 0.1<br />

Total 38.8 1.29 0.07 0.10 49.9 1.6<br />

Sheba’s Ridge Project Measured 28.0 0.88 0.07 0.20 24.6 0.8<br />

(35%)* Indicated 34.0 0.85 0.07 0.18 29.1 0.9<br />

Measured <strong>and</strong> Indicated 62.0 0.87 0.07 0.19 53.6 1.7<br />

Inferred 149.9 0.96 0.08 0.19 144.5 4.6<br />

Total 211.9 0.94 0.08 0.19 198.2 6.4<br />

AMERICAS<br />

Pedra Branca – Brazil<br />

(51%)* Inferred 6.6 2.27 0.03 0.23 15.0 0.5<br />

* Not included in regional Mineral Resources.<br />

Total 6.6 2.27 0.03 0.23 15.0 0.5<br />

Rounding of figures may result in computational discrepancies. Figures not included in the global Mineral Resource summary. 3E grade <strong>report</strong>ed: sum of platinum, palladium <strong>and</strong><br />

gold grades.<br />

Boikgantsho<br />

Sheba’s Ridge<br />

Pedra Branca<br />

Amplats <strong>and</strong> Anooraq Resources hold a 49% <strong>and</strong> 51% interest in Boikgantsho respectively. The figures quoted are for the attributable interest.<br />

During <strong>2011</strong>, a new Resource evaluation was completed by Amplats. Significant changes to the previous estimates conducted in 2004 are owing to:<br />

A cut-off grade of 1 g/t (3E) was applied (as used at Mogalakwena Platreef (1 g/t 4E)).<br />

Exclusion of oxidised material up to a depth of 40 m.<br />

The Resource evaluation <strong>report</strong>ed to a depth of 300 m below surface.<br />

Excludes losses owing to the major dykes <strong>and</strong> a swathe of 200 m either side of the major Drenthe fault, which has a horizontal displacement of<br />

approximately 2.2 km.<br />

Amplats, Industrial Development Corporation (IDC) <strong>and</strong> Aquarius South Africa hold a 35%, 26% <strong>and</strong> 39% interest in Sheba’s Ridge respectively.<br />

During <strong>2011</strong>, a new Resource evaluation was completed by external consultants on behalf of Aquarius Platinum South Africa.<br />

Reinterpretation of the geology, together with structural complexity, resulted in a revised model with a significant decrease of the Resource<br />

classification confidence.<br />

Additionally, the <strong>report</strong>ing depth below surface has been reduced.<br />

It must be noted that since <strong>2011</strong> the joint-venture area encompasses all prospects rights of the Sheba’s Ridge Project.<br />

The geological loss increased from a previously used 0.5% to 5% within the Measured category <strong>and</strong> to 10% within the Indicated <strong>and</strong> Inferred<br />

category.<br />

Previously, the cut-off grade used was $10.5/t recoverable value, a figure supplied by Ridge Mining using metal price projections <strong>and</strong><br />

metallurgical recoveries. This was changed to 0.5 g/t (3E) in the current model.<br />

Amplats <strong>and</strong> Solitario hold a 51% <strong>and</strong> 49% interest in Pedra Branca respectively. The figure quoted is for the attributable interest. A cut-off of<br />

0.7 g/t (3E) was used.<br />

River Valley In previous years Amplats held an attributable interest of 50%. During <strong>2011</strong>, Pacific North West Capital Corporation purchased the remaining 50%<br />

interest in the unincorporated joint venture covering the River Valley Project from Amplats. As a consequence the Mineral Resources are now<br />

excluded.<br />

34 ANGLO AMERICAN PLATINUM LIMITED <strong>2011</strong>