SECURING OUR FUTURE<br />
ORE RESERVE AND MINERAL RESOURCE ESTIMATES<br />
as at 31 December <strong>2011</strong><br />
Ore Reserve footnotes<br />
General<br />
Rustenburg mines<br />
Rounding of figures may result in computational discrepancies. 4E grade <strong>report</strong>ed: sum of platinum, palladium, rhodium <strong>and</strong> gold grades.<br />
Rustenburg consists of five mines <strong>and</strong> owing to benefits of time/extraction, internal boundaries change year-on-year. However, for reconciliation<br />
purposes the entire Rustenburg area will be compared.<br />
Merensky Reef<br />
The total Ore Reserve tonnage decreased by 38% to 32.9 Mt (2010: 53.0 Mt) <strong>and</strong> the 4E ounce content decreased by 35% to 5.6 Moz (2010:<br />
8.6 Moz). This was mainly owing to the following:<br />
Thembelani Mine – conversion of previously <strong>report</strong>ed Ore Reserves back to Mineral Resources owing to economic assumptions: -17.7 Mt -2.9 Moz.<br />
Production depletion: -3.0 Mt -0.5 Moz.<br />
As a consequence of the conversion reallocation the total Proved Ore Reserves tonnage decreased by 28% to 29.9 Mt (2010: 41.7 Mt) <strong>and</strong> the<br />
4E ounce content decreased by 24% to 5.2 Moz (2010: 6.9 Moz).<br />
UG2 Reef<br />
The total Ore Reserve tonnage increased by 22% to 186.9 Mt (2010: 153.3 Mt) <strong>and</strong> the 4E ounce content increased by 23% to 21.8 Moz (2010:<br />
17.7 Moz). This was mainly owing to additional conversion of Mineral Resources to Ore Reserves at the following mines:<br />
Thembelani Mine: +26 Mt +3.5 Moz.<br />
Siphumelele Mine: +9.2 Mt +0.9 Moz.<br />
Khomanani Mine: +3.1 Mt +0.5 Moz.<br />
The increase in tonnage is offset by production depletion: -6.0 Mt -0.6 Moz.<br />
Owing to conversion of Mineral Resources to Ore Reserves the total Proved Ore Reserves tonnage increased by 23% to 165.8 Mt (2010: 134.5 Mt)<br />
<strong>and</strong> the 4E ounce content increased by 25% to 19.2 Moz (2010: 15.4 Moz).<br />
Tumela Mine<br />
Previously <strong>report</strong>ed Ore Reserves have been reallocated back to Mineral Resources in the following areas:<br />
Portions of 4-shaft area as a result of mining engineering-related issues.<br />
In areas with complex geology causing unsafe conditions.<br />
Additionally, owing to the reduction in confidence for portions of 4-shaft area, the Reserve classification has been affected <strong>and</strong> the Proved Ore<br />
Reserves have been reclassified to Probable Ore Reserves.<br />
Merensky Reef<br />
The Ore Reserve tonnage decreased by 12% to 26.2 Mt (2010: 29.9 Mt) <strong>and</strong> the 4E ounce content decreased by 13% to 4.9 Moz (2010: 5.6 Moz).<br />
This was mainly owing to the following:<br />
Portions of 4-shaft owing to mining engineering-related issues (layout <strong>and</strong> design): -3.2 Mt -0.6 Moz.<br />
Production depletion: -0.5 Mt -0.1 Moz.<br />
The Proved Ore Reserve tonnage decreased by 92% to 1.0 Mt (2010: 11.9 Mt) <strong>and</strong> the 4E ounce content decreased by 91% to 0.2 Moz (2010:<br />
2.2 Moz).<br />
UG2 Reef<br />
The Ore Reserve tonnage decreased by 15% to 126.6 Mt (2010: 149.4 Mt) <strong>and</strong> the 4E ounce content decreased by 15% to 19.4 Moz (2010:<br />
22.7 Moz). This was mainly owing to the following:<br />
Portions of 4-shaft owing to mining engineering-related issues (layout <strong>and</strong> design) <strong>and</strong> owing to complex geology: -19.6 Mt - 2.8 Moz.<br />
Production depletion: -3.3 Mt -0.5 Moz.<br />
The Proved Ore Reserve tonnage decreased by 54% to 57.2 Mt (2010: 123.1 Mt) <strong>and</strong> the 4E ounce content decreased by 52% to 8.9 Moz<br />
(2010: 18.6 Moz).<br />
As a consequence of the reclassification of Proved to Probable Ore Reserves, the Probable Ore Reserve tonnage increased by 163%.<br />
Dishaba Mine<br />
Merensky Reef<br />
The Ore Reserve tonnage decreased by 2.7% to 15.5 Mt (2010: 16.0 Mt) but the 4E ounce content increased by 7.2% to 2.9 Moz (2010: 2.7 Moz)<br />
as a result of a change in the modifying factors; the Ore Reserve grade increased by 0.54 g/t from 5.25 g/t to 5.79 g/t.<br />
UG2 Reef<br />
The Ore Reserve tonnage decreased marginally by 0.6% but the 4E ounce content increased by 3.8% owing to changed modifying factors; the overall<br />
Ore Reserve grade increased by 0.20 g/t from 4.58 g/t to 4.79 g/t.<br />
Union Mine<br />
Amplats’ attributable interest is 85% of the Mineral Resources <strong>and</strong> Ore Reserves. The figures quoted are for the attributable interest only. Figures<br />
provided by Amplats.<br />
Merensky Reef<br />
The Ore Reserve tonnage decreased to 0.03 Mt owing to production depletion. The Ore Reserves will be mined out during 2012.<br />
UG2 Reef<br />
The Ore Reserve tonnage increased by 8.0% to 51.6 Mt (2010: 47.8 Mt) <strong>and</strong> the 4E ounce content increased by 15% to 7.3 Moz (2010: 6.3 Moz) as<br />
a result of additional converted Ore Reserves: +6.5 Mt +1.3 Moz.<br />
The increase in Ore Reserves is offset by production depletion: -2.7 Mt -0.4 Moz.<br />