General<br />

Ore Reserve pay limit<br />

The pay limit is based on Cost 4 which consists of ‘Direct Cash Cost’ (on- <strong>and</strong> off-mine), ‘Other Indirect Costs’ <strong>and</strong> ‘Stay-in-Business Capital’ (on- <strong>and</strong><br />

off-mine). The range is a function of various factors including depth of the <strong>ore</strong> body, geological complexity, infrastructure <strong>and</strong> economic parameters.<br />

The Merensky <strong>and</strong> UG2 Reef Ore Reserve pay limit varies across all operations between 1.8 g/t <strong>and</strong> 3.7 g/t. The pay limits for the Platreef varies<br />

between 1.0 <strong>and</strong> 1.7 g/t 4E.<br />

Merensky Reef The global Ore Reserve tonnage decreased by 19% to 113.0 Mt (2010: 140.2 Mt) <strong>and</strong> the 4E ounce content decreased by 18% to 18.5 Moz (2010:<br />

22.5 Moz), mainly owing to the following:<br />

Thembelani Mine: Conversion reallocation of previously <strong>report</strong>ed Ore Reserves back to Mineral Resources owing to economic assumptions:<br />

-17.7 Mt -2.9 Moz.<br />

Tumela Mine: Portions of 4-shaft area owing to mining engineering-related issues (layout <strong>and</strong> design) resulted in the reallocation of previously<br />

<strong>report</strong>ed Ore Reserves back to Mineral Resources: -3.2 Mt -0.6 Moz.<br />

Production depletion -5.7 Mt -0.9 Moz.<br />

These decreases were partially offset by the increase in Ore Reserves from Siphumelele Mine where additional Mineral Resources have been<br />

converted to Ore Reserves: +1.9 Mt +0.6 Moz.<br />

It must be noted that the global Ore Reserve grade increased by 0.10 g/t from 5.00 g/t to 5.10 g/t owing to the optimisation of the modifying factors<br />

especially at Dishaba <strong>and</strong> Siphumelele mines.<br />

Total Merensky Reserves (4E Moz)<br />

Changes between 2010 – <strong>2011</strong> (Amplats attributable)<br />

Reserves Moz<br />

23.5<br />

23.0<br />

22.5<br />

22.0<br />

21.5<br />

21.0<br />

20.5<br />

20.0<br />

19.5<br />

19.0<br />

18.5<br />

18.0<br />

17.5<br />

22.5 (0.9)<br />

Production<br />

0.6<br />

Conversion:<br />

+0.9 Moz<br />

0.4 (2.9)<br />

Economic<br />

assumptions<br />

Thembelani<br />

(0.1)<br />

(0.6)<br />

(0.1) (0.2)<br />

Reallocation Reserves to Resoures:<br />

-4.0 Moz<br />

(0.0) 18.5<br />

Securing<br />

our future<br />

Opening balance<br />

Production<br />

Conversion:<br />

Siphumelele<br />

Conversion:<br />

Dishaba<br />

Conversion reallocation:<br />

Thembelani<br />

Conversion reallocation:<br />

Khomanani<br />

Conversion reallocation:<br />

Tumela<br />

Conversion reallocation:<br />

BRPM<br />

Conversion reallocation:<br />

Bokoni<br />

Conversion reallocation:<br />

Khuseleka <strong>and</strong> Union<br />

Closing balance<br />

Reduction of 4.0 Moz (-18%)<br />

The Proved Ore Reserve tonnage decreased by 28% to 63.9 Mt (2010: 89.2 Mt) <strong>and</strong> the 4E ounce content decreased by 27% to 10.4 Moz<br />

(2010: 14.3 Moz) mainly owing to the following:<br />

Tumela Mine: Owing to the reduction in confidence for portions of 4-shaft area, the Reserve classification has been affected <strong>and</strong> the Proved Ore<br />

Reserves have been reclassified to Probable Ore Reserves: -11.0 Mt -2.0 Moz.<br />

Thembelani Mine: Owing to economic assumptions previously <strong>report</strong>ed Proved Ore Reserves have been reclassified back to Measured Mineral<br />

Resources: -10.1 Mt -1.7 Moz.<br />

UG2 Reef The global Ore Reserve tonnage increased by 1.7% to 640.7 Mt (2010: 630.2 Mt) <strong>and</strong> the 4E ounce content increased by 2.5% to 89.9 Moz (2010:<br />

87.6 Moz) mainly owing to the conversion from Mineral Resources to Ore Reserves at:<br />

Thembelani Mine: +26.0 Mt +3.5 Moz.<br />

Siphumelele Mine: +9.2 Mt +0.9 Moz.<br />

Union Mine: +6.5 Mt +1.3 Moz.<br />

Twickenham Platinum Mine: +4.4 Mt +0.8 Moz.<br />

Khomanani Mine: +3.1 Mt +0.5 Moz.<br />

These increases were partially offset by the decrease in Ore Reserves mainly from the following:<br />

Production depletion: -20.1 Mt -2.4 Moz.<br />

Portions of Tumela’s 4-shaft area owing to mining engineering-related issues resulted in the reallocation of previously <strong>report</strong>ed Ore Reserves back<br />

to Mineral Resources: -19.6 Mt - 2.8 Moz.<br />

ANGLO AMERICAN PLATINUM LIMITED <strong>2011</strong><br />

17