Ore Reserve pay limit<br />
The pay limit is based on Cost 4 which consists of ‘Direct Cash Cost’ (on- <strong>and</strong> off-mine), ‘Other Indirect Costs’ <strong>and</strong> ‘Stay-in-Business Capital’ (on- <strong>and</strong><br />
off-mine). The range is a function of various factors including depth of the <strong>ore</strong> body, geological complexity, infrastructure <strong>and</strong> economic parameters.<br />
The Merensky <strong>and</strong> UG2 Reef Ore Reserve pay limit varies across all operations between 1.8 g/t <strong>and</strong> 3.7 g/t. The pay limits for the Platreef varies<br />
between 1.0 <strong>and</strong> 1.7 g/t 4E.<br />
Merensky Reef The global Ore Reserve tonnage decreased by 19% to 113.0 Mt (2010: 140.2 Mt) <strong>and</strong> the 4E ounce content decreased by 18% to 18.5 Moz (2010:<br />
22.5 Moz), mainly owing to the following:<br />
Thembelani Mine: Conversion reallocation of previously <strong>report</strong>ed Ore Reserves back to Mineral Resources owing to economic assumptions:<br />
-17.7 Mt -2.9 Moz.<br />
Tumela Mine: Portions of 4-shaft area owing to mining engineering-related issues (layout <strong>and</strong> design) resulted in the reallocation of previously<br />
<strong>report</strong>ed Ore Reserves back to Mineral Resources: -3.2 Mt -0.6 Moz.<br />
Production depletion -5.7 Mt -0.9 Moz.<br />
These decreases were partially offset by the increase in Ore Reserves from Siphumelele Mine where additional Mineral Resources have been<br />
converted to Ore Reserves: +1.9 Mt +0.6 Moz.<br />
It must be noted that the global Ore Reserve grade increased by 0.10 g/t from 5.00 g/t to 5.10 g/t owing to the optimisation of the modifying factors<br />
especially at Dishaba <strong>and</strong> Siphumelele mines.<br />
Total Merensky Reserves (4E Moz)<br />
Changes between 2010 – <strong>2011</strong> (Amplats attributable)<br />
Reserves Moz<br />
23.5<br />
23.0<br />
22.5<br />
22.0<br />
21.5<br />
21.0<br />
20.5<br />
20.0<br />
19.5<br />
19.0<br />
18.5<br />
18.0<br />
17.5<br />
22.5 (0.9)<br />
Production<br />
0.6<br />
Conversion:<br />
+0.9 Moz<br />
0.4 (2.9)<br />
Economic<br />
assumptions<br />
Thembelani<br />
(0.1)<br />
(0.6)<br />
(0.1) (0.2)<br />
Reallocation Reserves to Resoures:<br />
-4.0 Moz<br />
(0.0) 18.5<br />
Securing<br />
our future<br />
Opening balance<br />
Production<br />
Conversion:<br />
Siphumelele<br />
Conversion:<br />
Dishaba<br />
Conversion reallocation:<br />
Thembelani<br />
Conversion reallocation:<br />
Khomanani<br />
Conversion reallocation:<br />
Tumela<br />
Conversion reallocation:<br />
BRPM<br />
Conversion reallocation:<br />
Bokoni<br />
Conversion reallocation:<br />
Khuseleka <strong>and</strong> Union<br />
Closing balance<br />
Reduction of 4.0 Moz (-18%)<br />
The Proved Ore Reserve tonnage decreased by 28% to 63.9 Mt (2010: 89.2 Mt) <strong>and</strong> the 4E ounce content decreased by 27% to 10.4 Moz<br />
(2010: 14.3 Moz) mainly owing to the following:<br />
Tumela Mine: Owing to the reduction in confidence for portions of 4-shaft area, the Reserve classification has been affected <strong>and</strong> the Proved Ore<br />
Reserves have been reclassified to Probable Ore Reserves: -11.0 Mt -2.0 Moz.<br />
Thembelani Mine: Owing to economic assumptions previously <strong>report</strong>ed Proved Ore Reserves have been reclassified back to Measured Mineral<br />
Resources: -10.1 Mt -1.7 Moz.<br />
UG2 Reef The global Ore Reserve tonnage increased by 1.7% to 640.7 Mt (2010: 630.2 Mt) <strong>and</strong> the 4E ounce content increased by 2.5% to 89.9 Moz (2010:<br />
87.6 Moz) mainly owing to the conversion from Mineral Resources to Ore Reserves at:<br />
Thembelani Mine: +26.0 Mt +3.5 Moz.<br />
Siphumelele Mine: +9.2 Mt +0.9 Moz.<br />
Union Mine: +6.5 Mt +1.3 Moz.<br />
Twickenham Platinum Mine: +4.4 Mt +0.8 Moz.<br />
Khomanani Mine: +3.1 Mt +0.5 Moz.<br />
These increases were partially offset by the decrease in Ore Reserves mainly from the following:<br />
Production depletion: -20.1 Mt -2.4 Moz.<br />
Portions of Tumela’s 4-shaft area owing to mining engineering-related issues resulted in the reallocation of previously <strong>report</strong>ed Ore Reserves back<br />
to Mineral Resources: -19.6 Mt - 2.8 Moz.<br />
ANGLO AMERICAN PLATINUM LIMITED <strong>2011</strong><br />