29.01.2015 Views

MEETING OF COUNCIL - Town of Cambridge

MEETING OF COUNCIL - Town of Cambridge

MEETING OF COUNCIL - Town of Cambridge

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>COUNCIL</strong> MINUTES<br />

TUESDAY 27 NOVEMBER 2012<br />

Overall in view <strong>of</strong> the above comments, and notwithstanding neighbour concerns, it is<br />

considered that the reduced rear boundary setback is acceptable and satisfies the<br />

performance criteria for the following reasons:-<br />

• the cabana does not have any significant impact on access to sun and ventilation and<br />

building bulk impact on the adjoining property.<br />

Assessment<br />

Gatehouse<br />

Acceptable Development Provision<br />

Maximum dimension <strong>of</strong> 2 metres<br />

Proposed<br />

2.4 metres<br />

Comment<br />

The proposed gatehouse structure has a dimension <strong>of</strong> 2.4 metres in lieu <strong>of</strong> the required<br />

2 metres. The increased dimension <strong>of</strong> 400mm is considered minor and due to the slight<br />

angled orientation <strong>of</strong> the gatehouse to the street/lot boundary is considered not to affect the<br />

streetscape. The structure is open, set back 1 metre from the street, is unattached to the<br />

existing dwelling. and has a total height below the maximum 3.5 metres and therefore<br />

satisfies the policy for gatehouses in the street setback.<br />

POLICY/STATUTORY IMPLICATIONS:<br />

There are no policy or statutory implications related to this report. The proposal was<br />

assessed against the provisions <strong>of</strong> the Residential Design Codes (R Codes), <strong>Town</strong> Planning<br />

Scheme No.1, and the <strong>Town</strong> Planning Scheme Policy Manual.<br />

FINANCIAL IMPLICATIONS:<br />

There are no financial implications related to this report.<br />

STRATEGIC DIRECTION:<br />

Consideration <strong>of</strong> this application is consistent with the <strong>Town</strong>'s Strategic Plan 2009-2020 for<br />

the priority area 'Planning for our Community'.<br />

COMMUNITY CONSULTATION:<br />

This matter has been assessed under the Community Consultation Policy. The requirements<br />

for consultation have been satisfied under the statutory provisions <strong>of</strong> the <strong>Town</strong> Planning<br />

Scheme.<br />

ATTACHMENTS:<br />

1. Summary <strong>of</strong> applicant's justification and neighbour comments.<br />

H:\CEO\GOV\<strong>COUNCIL</strong> MINUTES\12 MINUTES\NOVEMBER 2012\B DV.DOCX 73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!