29.01.2015 Views

MEETING OF COUNCIL - Town of Cambridge

MEETING OF COUNCIL - Town of Cambridge

MEETING OF COUNCIL - Town of Cambridge

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>COUNCIL</strong> MINUTES<br />

TUESDAY 27 NOVEMBER 2012<br />

Question 2<br />

Does the <strong>Town</strong> realise that two thirds <strong>of</strong> the overall budget, $4m <strong>of</strong> the $6m, would result<br />

in an extra seating capacity <strong>of</strong> only approximately 250. Could the Architects prepare<br />

alternative plans for a budget <strong>of</strong> $2m which would upgrade the present quarry facilities,<br />

retain the original quarry and increase the seating<br />

Response<br />

The Mayor advised that all views will be considered as part <strong>of</strong> the consultation process.<br />

Question 3<br />

As the Xmas season is coming up, can the public comment period be either extended ro<br />

started a little later<br />

Response<br />

The Chief Executive advised that the consultation period could be extended. This matter<br />

will be considered at tonight's meeting.<br />

Julie Hawkins<br />

Re: Item DV12.135 - Windarra Drive, City Beach, cnr Adina Road - Two Storey<br />

Dwelling<br />

Question<br />

At the Development Committee, it was recommended that the house be dropped by<br />

500mm. I am not 100% sure when looking at the amended plans if this has happened.<br />

The ro<strong>of</strong> line has been dropped a little but it also has a 2 degree pitch which may negate<br />

any drop in ro<strong>of</strong> line. Looking at the plans and the eye viewing level, it looks like that<br />

level has changed. Can the Council make the viewing level be taken from the AHD<br />

viewing level and 500mm below<br />

Response<br />

The Director Development and Sustainability advised that the amended plans have<br />

development as having the FFL at ground level as being dropped by 250mm and the<br />

height <strong>of</strong> the ro<strong>of</strong> has been dropped by a similar amount therefore the overall reduction in<br />

height to the top <strong>of</strong> the ro<strong>of</strong> is 500mm.<br />

4. PETITIONS<br />

Nil<br />

5. DEPUTATIONS<br />

Nil<br />

H:\Ceo\Gov\Council Minutes\12 MINUTES\November 2012\A Council Front.docx 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!