29.01.2015 Views

MEETING OF COUNCIL - Town of Cambridge

MEETING OF COUNCIL - Town of Cambridge

MEETING OF COUNCIL - Town of Cambridge

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>COUNCIL</strong> MINUTES<br />

TUESDAY 27 NOVEMBER 2012<br />

CR12.179 WEMBLEY GOLF COURSE TRAIL - CONCEPT PLAN<br />

PURPOSE <strong>OF</strong> REPORT:<br />

To review the concept plan <strong>of</strong> the Wembley Golf Course Trail as a prerequisite for<br />

preparation <strong>of</strong> draft 2013/2014 Budget.<br />

BACKGROUND:<br />

The 2012/2013 Budget provided funding to undertake conceptual planning <strong>of</strong> a trail through<br />

Wembley Golf Course that could link to a broader network <strong>of</strong> trails both within and outside <strong>of</strong><br />

the <strong>Town</strong>.<br />

This conceptual planning has been completed and is detailed for consideration <strong>of</strong> funding in<br />

2013/2014 to undertake full design and construction.<br />

DETAILS:<br />

A concept design has been developed for a series <strong>of</strong> staged development <strong>of</strong> trails within<br />

Wembley Golf Course as follows:-<br />

Basic Design Features<br />

• Predominantly asphalt sealed path <strong>of</strong> nominal 2.5 metres or 3 metres width (except<br />

where noted below);<br />

• Trail follows natural contours <strong>of</strong> ground where possible (ie minimal earthworks);<br />

• Trail suitable for walkers and cyclists;<br />

• Fencing to mitigate risk <strong>of</strong> users accessing golf course. Fencing to be well away from<br />

trail where possible to improve visual amenity;<br />

• Connections to existing pedestrian paths;<br />

• Interpretative and way-finding signage to be included;<br />

• Paths are mainly unlit, suitable for day time use only.<br />

Stage 1A<br />

• A new path extending from the top <strong>of</strong> the driving range, through bush areas to join<br />

Empire Avenue near Newman College;<br />

• Use existing Service road beside driving range then new asphalt path from bottom <strong>of</strong><br />

driving range to opening in fence at Empire Avenue near Newman College;<br />

• A grade separated cross over such that trail users do not conflict with golfers & service<br />

vehicles near the junction <strong>of</strong> the Old Course 10 th green and 11 th tee;<br />

• Chain mesh fence well set back from the trail in areas not immediately adjacent to<br />

fairways;<br />

• "Palisade" type fencing to match existing fences near the driving range;<br />

• Safety screening where necessary to mitigate errant golf balls hitting trail users.<br />

H:\CEO\GOV\<strong>COUNCIL</strong> MINUTES\12 MINUTES\NOVEMBER 2012\C CR.DOCX 162

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!