29.01.2015 Views

MEETING OF COUNCIL - Town of Cambridge

MEETING OF COUNCIL - Town of Cambridge

MEETING OF COUNCIL - Town of Cambridge

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>COUNCIL</strong> MINUTES<br />

TUESDAY 27 NOVEMBER 2012<br />

CR12.173 PERTH BICYCLE NETWORK GRANTS 2012-2013 - BROOKDALE STREET<br />

SHARED PATH<br />

PURPOSE <strong>OF</strong> REPORT:<br />

To endorse the alignment for the shared path project on Brookdale Street that is funded in the<br />

2012/13 Budget.<br />

BACKGROUND:<br />

In October 2011, Council considered report 'Perth Bicycle Network – Grant Submissions<br />

2011/12 and 2012/13' (Item CR11.125) and decided that:-<br />

(ii)<br />

The projects submitted for the 2012/13 Perth Bicycle Network (PBN) Local Government<br />

Grants program are to be:-<br />

• Selby Street – shared path between The Boulevard and Grantham Street, west side<br />

$110,000;<br />

• Brookdale Street – shared path between Alderbury Street and Oceanic Drive $TBA."<br />

This decision was carried out and the outcome was:-<br />

• The Selby Street project was not <strong>of</strong>fered a grant; and<br />

• The <strong>Town</strong> was successful with a $25,000 grant for the shared path project on Brookdale<br />

Street (Alderbury Street to Oceanic Drive) ‘Install 3 metre concrete shared path length<br />

400 metre’. This is included in the current 2012/13 Budget with total funding <strong>of</strong> $100,000.<br />

DETAILS:<br />

The existing paths on both sides <strong>of</strong> Brookdale Street were all constructed since 2004. The<br />

current status <strong>of</strong> the paths are:-<br />

Location West Side East Side<br />

3.0 metre wide brown asphalt path<br />

with flush kerb It meanders through<br />

public open space and is part <strong>of</strong> the<br />

City to Sea principal shared path in<br />

the Perth Bicycle Network.<br />

Underwood Avenue<br />

to Alderbury Street<br />

Alderbury Street to<br />

Salvado Road<br />

Salvado Road to<br />

Oakdale Street<br />

Oakdale Street to<br />

Oceanic Drive<br />

2.0 metre wide concrete path next<br />

to parking lane.<br />

1.5 metre and 2.0 metre wide<br />

concrete path next to parking lane.<br />

2.5 metre wide concrete path next<br />

to traffic lane. Transmission poles<br />

are on other side <strong>of</strong> the path.<br />

2.0 metre wide concrete path next to<br />

boundary. This was constructed by<br />

City <strong>of</strong> Nedlands in 2004.<br />

1.5 metre wide concrete path next to<br />

boundary.<br />

1.5 metre wide concrete path next to<br />

boundary.<br />

1.5 metre wide concrete path next to<br />

boundary.<br />

H:\CEO\GOV\<strong>COUNCIL</strong> MINUTES\12 MINUTES\NOVEMBER 2012\C CR.DOCX 125

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!