<strong>COUNCIL</strong> MINUTES<br />

TUESDAY 27 NOVEMBER 2012<br />

• the Park Improvement Concept Plans Design Brief be endorsed;<br />

• Council decide on how many Park Improvement Concept Plans to develop;<br />

• Council approve a funding source for the consultancy;<br />

• Park Improvement Concept Plans be developed in draft form and presented to Council at<br />

a future meeting for consideration and to endorse a public consultation process. It is<br />

recommended that this be undertaken within a single report to Council which will include<br />

the details <strong>of</strong> each plan;<br />

• following public consultation, the concept plans be finalised and presented to Council for<br />

endorsement and consideration <strong>of</strong> a Park Improvement Implementation Program; and<br />

these projects be listed for consideration in the 2013/2014 budget process for<br />

construction.<br />

POLICY/STATUTORY IMPLICATIONS:<br />

There are no Policy Implications related to this report.<br />

A statutory implication will be applicable if unbudgeted expenditure is approved as required by<br />

Section 6.8 <strong>of</strong> the Local Government Act 1995.<br />

FINANCIAL IMPLICATIONS:<br />

The cost to develop four park improvement concept plans is estimated at approximately<br />

$40,000.<br />

There are no surplus funds currently available from existing construction projects within the<br />

2012/2013 budget to produce the plans outlined in this report. The Administration has fully<br />

allocated its resources to the 2012/2013 budget.<br />

Should Council wish to defer to 2013/2014 allocations, the following projects are listed for<br />

consideration as no work has commenced on these projects at the moment:-<br />

1. Lake Monger Reserve - ($20,000). Carpark/toilet design in the South East area <strong>of</strong> the<br />

Reserve on the old freeway access reserve land;<br />

2. Lake Monger Reserve - ($80,000). Recreation activities (tennis or similar). As little<br />

master planning has commenced in relation to the ultimate size and location <strong>of</strong> this<br />

facility, it is unlikely construction will commence in the 2012/13 budget period. This<br />

allocation is only sufficient for construction <strong>of</strong> 1 tennis court (no lighting); and<br />

3. City Beach Civic Centre - ($50,000). This allocation is to upgrade the garden beds<br />

including weed removal, planting and to repair retaining walls.<br />

For Council to proceed with this project in the 2012/13 budget without reallocating existing<br />

budgets, the $40,000 required will need to be approved as unbudgeted expenditure.<br />

STRATEGIC DIRECTION:<br />

This report Recommendation embraces the following strategies <strong>of</strong> the <strong>Town</strong>’s Strategic Plan<br />

2009-2020:-<br />

• Enhance and retain public open space, wherever possible;<br />

• Maintain quality Parks Infrastructure;<br />

• Continuously adapt and improve our services;<br />

H:\CEO\GOV\<strong>COUNCIL</strong> MINUTES\12 MINUTES\NOVEMBER 2012\C CR.DOCX 109