29.01.2015 Views

Staff Reports - East Bay Municipal Utility District

Staff Reports - East Bay Municipal Utility District

Staff Reports - East Bay Municipal Utility District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Drainage patterns may be temporarily disrupted during construction. Standard<br />

Construction Specifications will require that the contractor develop and<br />

implement an erosion and sedimentation control plan for work performed in<br />

unpaved areas.<br />

As a result of these project circumstances, the Project will have less than<br />

significant impacts to Hydrology and Water Quality.<br />

M. Land Use and Planning<br />

Impact: No Impact<br />

Findings: No change in land use or dividing an established community will result<br />

from the Project. Therefore, the Project would not conflict with established<br />

communities, General Plan designations, zoning, or habitat conservation plans.<br />

As a result of these project circumstances, the Project will have no impacts to<br />

Land Use and Planning.<br />

N. Mineral Resources<br />

Impacts: No Impact<br />

Findings: No mineral deposits of economic significant are known to exist within<br />

the project boundary.<br />

As a result of these project circumstances, the Project will have no impacts to<br />

known Mineral Resources.<br />

O. Population and Housing and Growth Inducement<br />

Impacts: No Impact<br />

Findings: The Project will not induce population growth by making additional<br />

water supply available for new development. The Project refurbishes and replaces<br />

existing facilities to improve the reliability of the existing water distribution<br />

system for existing customers. No housing presently exists at the project site<br />

where the new pumping plant and rate control station will be constructed or where<br />

the new pipelines will be installed, which will occur within public roadways;<br />

therefore, the proposed Project would not displace housing. The Project would not<br />

displace people or housing from the site and no relocation would be required<br />

As a result of these project circumstances, the Project will have no impacts to<br />

Population and Housing and Growth Inducement.<br />

P. Public Services

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!