39TH AVENUE RESERVOIR REPLACEMENT PROJECT<br />

MITIGATION MONITORING AND REPORTING PROGRAM<br />

Mitigation Measures<br />

on the site will be preserved. Prior to the start of<br />

any clearing, stockpiling, excavation, compaction,<br />

paving, changes in ground elevation, changes in<br />

construction, retained trees that are adjacent to or<br />

within proposed project construction areas will be<br />

identified and clearly delineated by protective<br />

fencing, which shall remain in place for the<br />

duration of all construction work.<br />

Impact being<br />

Mitigated<br />

or removed during<br />

construction.<br />

Timing<br />

Requirement<br />

Responsibility<br />

for<br />

Implementation<br />

Responsibility<br />

for<br />

Monitoring<br />

Design Phase<br />

Check Box<br />

Construction<br />

Phase<br />

Check Box<br />

Post-<br />

Construction<br />

Phase<br />

Check Box<br />

Mitigation Measure BIO-3: In the event that<br />

impacts to mapped wetland or other waters of the<br />

U.S. are identified, EBMUD will consult with the<br />

Corps, CDFG, and Regional Water Quality<br />

Control Board regarding the most appropriate<br />

assessment and mitigation methods to adequately<br />

address losses to wetland function that could<br />

occur as a result of the project. The appropriate<br />

permits will be obtained and the mitigation<br />

measures outlined within these permits will be<br />

implemented. All mitigation work shall be<br />

authorized by applicable permits and will reduce<br />

potential impacts to Less than Significant.<br />

Impact BIO-3:<br />

Protect wetland<br />

functions that<br />

could be damaged<br />

or removed during<br />

construction<br />

GEOLOGY/SOILS<br />

Mitigation Measure GEO-1: The tank has been<br />

designed to have a setback from known active<br />

traces of the fault and will meet or exceed the<br />

Uniform Building Code and American Water<br />

Works Association standards for foundation<br />

design<br />

Impact GEO-1: :<br />

Facility damage or<br />

service<br />

interruptions<br />

resulting from<br />

strong ground<br />

shaking<br />

Design/<br />

Construction<br />

Design Engineer/<br />

Construction<br />

Inspection<br />

Record of<br />

Engineer/<br />

EBMUD<br />

Construction<br />

Inspector<br />

Completed by<br />

Date<br />

Completed by<br />

Date<br />

NA