39TH AVENUE RESERVOIR REPLACEMENT PROJECT<br />

MITIGATION MONITORING AND REPORTING PROGRAM<br />

Mitigation Measures<br />

reducing the maximum idling time to 5<br />

minutes (as required by the California<br />

airborne toxics control measure Title 13,<br />

Section 2485 of California Code of<br />

Regulations [CCR]).<br />

• All construction equipment shall be<br />

maintained and properly tuned, in accordance<br />

with manufacturer's specifications. All<br />

equipment shall be checked by a certified<br />

mechanic and determined to be running in<br />

proper condition prior to operation. EBMUD<br />

will request and maintain logs that certify the<br />

proper operating condition of construction<br />

vehicles.<br />

Impact being<br />

Mitigated<br />

Timing<br />

Requirement<br />

Responsibility<br />

for<br />

Implementation<br />

Responsibility<br />

for<br />

Monitoring<br />

Design Phase<br />

Check Box<br />

Construction<br />

Phase<br />

Check Box<br />

Post-<br />

Construction<br />

Phase<br />

Check Box<br />

BIOLOGICAL RESOURCES<br />

Mitigation Measure BIO-1: If site clearing,<br />

demolition, and construction do not commence<br />

between September 1 and January 31, then<br />

preconstruction surveys, for nesting birds should<br />

be conducted by a qualified biologist to ensure<br />

that no nest will be disturbed during project<br />

implementation. This survey shall be conducted<br />

no more than 14 days prior to the initiation of<br />

demolition/construction activities during the early<br />

part of the breeding season (February through<br />

April) and no more than 30 days prior to the<br />

initiation of these activities during the late part of<br />

the breeding season (May through August).<br />

During this survey, the biologist will inspect all<br />

trees and other habitats in and immediately<br />

adjacent to the impact areas for nests.<br />

Impact BIO-1:<br />

Special status plant<br />

or wildlife species<br />

could be<br />

encountered during<br />

the construction of<br />

the reservoir.<br />

Pre-<br />

Construction<br />

EBMUD<br />

Biologist<br />

EBMUD<br />

Construction<br />

Inspector<br />

Completed by<br />

Date<br />

Completed by<br />

Date<br />

NA<br />

If an active nest is found sufficiently close to work<br />

areas to be disturbed by these activities, the