39TH AVENUE RESERVOIR REPLACEMENT PROJECT<br />
MITIGATION MONITORING AND REPORTING PROGRAM<br />
Mitigation Measures<br />
reducing the maximum idling time to 5<br />
minutes (as required by the California<br />
airborne toxics control measure Title 13,<br />
Section 2485 of California Code of<br />
Regulations [CCR]).<br />
• All construction equipment shall be<br />
maintained and properly tuned, in accordance<br />
with manufacturer's specifications. All<br />
equipment shall be checked by a certified<br />
mechanic and determined to be running in<br />
proper condition prior to operation. EBMUD<br />
will request and maintain logs that certify the<br />
proper operating condition of construction<br />
vehicles.<br />
Impact being<br />
Mitigated<br />
Timing<br />
Requirement<br />
Responsibility<br />
for<br />
Implementation<br />
Responsibility<br />
for<br />
Monitoring<br />
Design Phase<br />
Check Box<br />
Construction<br />
Phase<br />
Check Box<br />
Post-<br />
Construction<br />
Phase<br />
Check Box<br />
BIOLOGICAL RESOURCES<br />
Mitigation Measure BIO-1: If site clearing,<br />
demolition, and construction do not commence<br />
between September 1 and January 31, then<br />
preconstruction surveys, for nesting birds should<br />
be conducted by a qualified biologist to ensure<br />
that no nest will be disturbed during project<br />
implementation. This survey shall be conducted<br />
no more than 14 days prior to the initiation of<br />
demolition/construction activities during the early<br />
part of the breeding season (February through<br />
April) and no more than 30 days prior to the<br />
initiation of these activities during the late part of<br />
the breeding season (May through August).<br />
During this survey, the biologist will inspect all<br />
trees and other habitats in and immediately<br />
adjacent to the impact areas for nests.<br />
Impact BIO-1:<br />
Special status plant<br />
or wildlife species<br />
could be<br />
encountered during<br />
the construction of<br />
the reservoir.<br />
Pre-<br />
Construction<br />
EBMUD<br />
Biologist<br />
EBMUD<br />
Construction<br />
Inspector<br />
Completed by<br />
Date<br />
Completed by<br />
Date<br />
NA<br />
If an active nest is found sufficiently close to work<br />
areas to be disturbed by these activities, the