Findings: The project would result in maximum daily emissions levels that are below<br />

BAAQMD thresholds. Therefore, the project's impact related to construction-period<br />

criteria pollutant emissions is Less than Significant. However, BAAQMD recommends<br />

implementation of construction mitigation measures to reduce construction-related<br />

emissions for all projects, regardless of the significance level of construction-period<br />

impacts. These measures are identified as Mitigation Measure AIR-1 in the MND and<br />

MMRP.<br />

Construction activities can also result in fugitive dust, which contributes to particulate<br />

matter levels. While construction-period dust emissions have been estimated, BAAQMD<br />

does not have a threshold of significance for fugitive dust impacts, but instead regards<br />

fugitive dust impacts to be mitigated if appropriate management practices are<br />

implemented. BAAQMD-recommended basic construction management practices are<br />

included in Mitigation Measure AIR-1.<br />

Consistent with BAAQMD recommendations, the fugitive dust emissions presented in<br />

the MMRP have been reduced by 53 percent to reflect implementation of the measures<br />

included in Mitigation Measure AIR-1 in the MND and MMRP.<br />

Facts in Support of Findings: Measure AIR-1 incorporating the BAAQMD "Basic<br />

Construction Mitigation Measures" is hereby incorporated and imposed and shall be<br />

monitored in compliance with the MMRP. Because EBMUD has agreed to this<br />

mitigation, any air quality impacts have been avoided or will be reduced to a Less than<br />

Significant level.<br />

As a result of these project circumstances, and by employing this mitigation measure, the<br />

Project will have Less than Significant impacts to Air Quality resources.<br />

C. Biological Resources<br />

Impact: Less Than Significant with Mitigation Incorporated<br />

Findings: The Project site is within a developed urban area, and based on the archival<br />

research and field surveys undertaken by EBMUD it is unlikely that special status species<br />

occur on the Project site or that project construction and operation would interfere<br />

substantially with the movement of any resident or migratory fish or wildlife species or<br />

with established native resident or migratory corridors. Furthermore, potential impacts to<br />

candidate, sensitive, or special status species associated with the Project would be Less<br />

than Significant with implementation of the survey measures in Mitigation Measure<br />

BIO-1 identified in the MND and MMRP and employment of avoidance and mitigation<br />

measures to limit impacts as necessary.<br />

Approximately five to ten trees will be removed at the 39 th Avenue Reservoir site in order<br />

to replace the existing inlet/outlet pipeline. All other trees at the site will be preserved.<br />

The proposed tree removals are necessary to the project and will allow EBMUD to<br />

; maintain water service to the community and will not result in significant impacts